Southeastern had 1,501 scheduled stops at Bellingham in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 77.9% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
Southeastern trains at Bellingham also serve Lower Sydenham (1.3 km south-west, 93.7% on time, 1.2% cancelled), Catford Bridge (1.4 km north, 93.1% on time, 1.1% cancelled), New Beckenham (2.1 km south-west, 93.5% on time, 1.1% cancelled), Hither Green (2.5 km north-east, 87.7% on time, 1.3% cancelled), Beckenham Junction (2.5 km south, 84.4% on time, 2.3% cancelled) and Ladywell (2.6 km north, 93.0% on time, 1.1% cancelled), which are the stations on its network closest to Bellingham.
Within 30 km of here, Southeastern runs best at Sundridge Park, 3.5 km south-east (99.4%), and worst at Hildenborough, 29.7 km south-east (70.3%).
The busiest Southeastern station within 30 km of Bellingham is London Bridge, 9.2 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Bellingham, Southeastern is the least punctual, at 77.9%.
For Southeastern, Bellingham is the 132nd best of 173 ranked stations. Its 77.9% here is 6.3 percentage points below the 84.2% across the whole network.
Southeastern cancels more at Bellingham than elsewhere: 2.9% of scheduled stops, against 1.7% across its network and 4.0% for every operator at the station.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120 | 68.9% | 0.8% |
| Period 6 of 2026-27 | 114 | 73.6% | 3.5% |
| Period 5 of 2026-27 | 120 | 81.7% | 0.0% |
| Period 4 of 2026-27 | 120 | 85.6% | 1.7% |
| Period 3 of 2026-27 | 120 | 79.8% | 4.2% |
| Period 2 of 2026-27 | 108 | 83.5% | 15.7% |
| Period 1 of 2026-27 | 127 | 89.7% | 0.8% |
| Period 13 of 2025-26 | 132 | 85.3% | 2.3% |
| Period 12 of 2025-26 | 120 | 86.7% | 0.0% |
| Period 11 of 2025-26 | 120 | 84.0% | 0.8% |
| Period 10 of 2025-26 | 60 | 71.2% | 1.7% |
| Period 9 of 2025-26 | 120 | 57.6% | 1.7% |
| Period 8 of 2025-26 | 120 | 60.5% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bellingham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 33,130 | 89.4% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out