Battersby
BTTYorkshire and The HumberManaged by Northern Trains
How this station is performing
Battersby had 4,241 scheduled stops to Period 7 of 2026-27, about 12 a day. 81.9% of recorded arrivals were within three minutes of the timetable and 1.1% of scheduled stops were cancelled.
Battersby opened on 1 April 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Nunthorpe is the oldest (1854) and Commondale the newest (1882), with Battersby in between.
The nearest stations to Battersby are Kildale (2.7 km north-east), Great Ayton (3.8 km north), Commondale (8.0 km east), Nunthorpe (9.3 km north-west) and Castleton Moor (9.5 km east). 5 stations lie within 10 km in all. Of the five, Nunthorpe is the most punctual at 85.7% and Castleton Moor the least at 78.6%, with Battersby on 81.9%.
Battersby takes its name from a Village called Battersby, and the station stands 0.9 km from its centre.
Battersby improved sharply over the past year. In the latest 13 periods 81.9% of stops came within three minutes of the timetable, up 6.5 percentage points from 75.4% in the 13 before. Cancellations fell to 1.1% of scheduled stops from 3.4%, which is 2.3 percentage points fewer.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Battersby is the least punctual, at 81.9%. All of them are ahead, including Grosmont (84.9%), Whitby (85.3%) and Glaisdale (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 4,241 | 81.9% | 1.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 320 | 86.3% | 0.0% |
| Period 6 of 2026-27 | 320 | 88.8% | 0.3% |
| Period 5 of 2026-27 | 320 | 77.3% | 1.9% |
| Period 4 of 2026-27 | 318 | 88.1% | 0.0% |
| Period 3 of 2026-27 | 319 | 86.6% | 3.4% |
| Period 2 of 2026-27 | 320 | 82.1% | 2.2% |
| Period 1 of 2026-27 | 368 | 90.3% | 0.8% |
| Period 13 of 2025-26 | 352 | 82.5% | 1.4% |
| Period 12 of 2025-26 | 260 | 88.8% | 0.8% |
| Period 11 of 2025-26 | 320 | 79.9% | 0.0% |
| Period 10 of 2025-26 | 292 | 80.2% | 0.7% |
| Period 9 of 2025-26 | 364 | 64.8% | 1.9% |
| Period 8 of 2025-26 | 368 | 70.8% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out