Whitby had 4,034 scheduled stops to Period 7 of 2026-27, about 11 a day. 85.3% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Whitby opened on 8 June 1835. It was moved to the site it uses now on 1 July 1847. Of the 5 stations nearest to it with a known opening date, Whitby is the oldest; the next oldest, Ruswarp, dates from 1835.
The nearest stations to Whitby are Ruswarp (1.8 km south-west), Sleights (4.0 km south-west), Grosmont (8.9 km south-west), Egton (10.8 km south-west) and Glaisdale (12.6 km south-west). 3 stations lie within 10 km in all. At 85.3%, Whitby is more punctual than every one of them; the best of the five, Egton, manages 85.3%.
Whitby is one of 3 stations named after a town of the United Kingdom called Whitby, home to about 13,594 people; this one stands 0.4 km from its centre.
Whitby improved sharply over the past year. In the latest 13 periods 85.3% of stops came within three minutes of the timetable, up 8.8 percentage points from 76.5% in the 13 before. Cancellations fell to 1.5% of scheduled stops from 2.6%, which is 1.1 percentage points fewer.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Whitby is the most punctual, at 85.3%. The comparison group includes Grosmont (84.9%), Glaisdale (85.0%) and Egton (85.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 4,034 | 85.3% | 1.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 320 | 90.0% | 0.0% |
| Period 6 of 2026-27 | 320 | 91.5% | 1.3% |
| Period 5 of 2026-27 | 320 | 81.2% | 1.9% |
| Period 4 of 2026-27 | 320 | 88.4% | 0.0% |
| Period 3 of 2026-27 | 320 | 90.2% | 4.1% |
| Period 2 of 2026-27 | 320 | 88.4% | 3.1% |
| Period 1 of 2026-27 | 368 | 89.0% | 1.4% |
| Period 13 of 2025-26 | 352 | 87.6% | 1.4% |
| Period 12 of 2025-26 | 260 | 91.1% | 0.8% |
| Period 11 of 2025-26 | 320 | 82.1% | 0.6% |
| Period 10 of 2025-26 | 270 | 82.1% | 0.7% |
| Period 9 of 2025-26 | 272 | 68.8% | 3.3% |
| Period 8 of 2025-26 | 272 | 74.0% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.