How this station is performing
Bathgate had 35,663 scheduled stops to Period 7 of 2026-27, about 98 a day. 87.5% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Bathgate opened on 18 October 2010, 16 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bathgate is the newest; the oldest, Livingston North, opened in 1849.
The nearest stations to Bathgate are Armadale (West Lothian) (3.7 km west), Livingston North (5.8 km east), Addiewell (6.2 km south), West Calder (6.5 km south-east) and Blackridge (7.2 km west). 10 stations lie within 10 km in all. At 87.5%, Bathgate is less punctual than all of them; the best of the five, West Calder, manages 91.4%.
Bathgate takes its name from a town called Bathgate, home to about 22,920 people, and the station stands 0.7 km from its centre.
Across the whole run of data, the weakest four-week period for Bathgate was Period 8 of 2024-25, at 74.1%, some time before the latest year. The strongest was Period 4 of 2023-24, at 92.1%, and the two are 18.0 percentage points apart. Cancellations peaked at 6.6% of scheduled stops in Period 1 of 2024-25, against 2.0% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Bathgate is the least punctual, at 87.5%. All of them are ahead, including Cathcart (95.7%), Greenfaulds (89.8%) and Cumbernauld (87.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 35,663 | 87.5% | 2.0% |
Operators with their own page for this station are linked to it.
Late train at Bathgate? Delay Repay
These operators call at Bathgate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,716 | 85.4% | 0.7% |
| Period 6 of 2026-27 | 2,719 | 89.5% | 2.6% |
| Period 5 of 2026-27 | 2,722 | 89.6% | 1.8% |
| Period 4 of 2026-27 | 2,717 | 89.3% | 3.3% |
| Period 3 of 2026-27 | 2,720 | 90.4% | 1.1% |
| Period 2 of 2026-27 | 2,716 | 89.5% | 2.2% |
| Period 1 of 2026-27 | 3,123 | 89.3% | 1.5% |
| Period 13 of 2025-26 | 2,976 | 88.6% | 2.5% |
| Period 12 of 2025-26 | 2,716 | 89.0% | 2.4% |
| Period 11 of 2025-26 | 2,716 | 87.7% | 1.0% |
| Period 10 of 2025-26 | 2,390 | 85.3% | 1.5% |
| Period 9 of 2025-26 | 2,716 | 80.3% | 2.9% |
| Period 8 of 2025-26 | 2,716 | 82.3% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cathcart | 35,752 | 95.7% | 1.3% |
| Greenfaulds | 34,244 | 89.8% | 1.3% |
| Cumbernauld | 34,121 | 87.9% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out