Barry
BRYWalesManaged by TfW Rail
How this station is performing
Barry had 43,565 scheduled stops to Period 7 of 2026-27, about 120 a day. 93.4% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Barry opened on 8 February 1889, 137 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Barry Docks is the oldest (1888) and Rhoose Cardiff International Airport the newest (1897), with Barry in between.
The nearest stations to Barry are Barry Island (0.9 km south-east), Barry Docks (1.8 km east), Cadoxton (3.0 km north-east), Rhoose Cardiff International Airport (4.6 km west) and Dinas Powys (6.0 km north-east). 9 stations lie within 10 km in all. Of the five, Barry Island is the most punctual at 96.4% and Rhoose Cardiff International Airport the least at 86.2%, with Barry on 93.4%.
Barry is one of 2 stations named after a town called Barry, home to about 53,369 people; this one stands 1.6 km from its centre.
Compared with 3 stations of a similar size in Wales, Barry is the most punctual, at 93.4%. The comparison group includes Barry Docks (89.8%), Cadoxton (90.3%) and Cogan (89.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 43,565 | 93.4% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Barry? Delay Repay
These operators call at Barry and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,278 | 92.9% | 2.0% |
| Period 6 of 2026-27 | 3,326 | 94.1% | 1.0% |
| Period 5 of 2026-27 | 3,374 | 92.8% | 3.6% |
| Period 4 of 2026-27 | 3,283 | 92.4% | 2.9% |
| Period 3 of 2026-27 | 3,295 | 93.3% | 1.9% |
| Period 2 of 2026-27 | 3,352 | 95.2% | 3.8% |
| Period 1 of 2026-27 | 3,837 | 95.5% | 2.4% |
| Period 13 of 2025-26 | 3,642 | 95.8% | 3.3% |
| Period 12 of 2025-26 | 3,330 | 95.7% | 1.1% |
| Period 11 of 2025-26 | 3,239 | 96.0% | 3.1% |
| Period 10 of 2025-26 | 2,966 | 90.7% | 3.1% |
| Period 9 of 2025-26 | 3,326 | 88.6% | 3.3% |
| Period 8 of 2025-26 | 3,317 | 90.5% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barry Docks | 43,451 | 89.8% | 3.2% |
| Cadoxton | 43,451 | 90.3% | 3.2% |
| Cogan | 43,451 | 89.8% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out