How this station is performing
Barnes had 69,427 scheduled stops to Period 7 of 2026-27, about 191 a day. 88.2% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Barnes opened on 27 July 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barnes is the oldest; the next oldest, Mortlake, dates from 1846.
The nearest stations to Barnes are Barnes Bridge (1.0 km north-west), Mortlake (1.9 km west), Putney (1.9 km east), Chiswick (2.5 km north-west) and North Sheen (3.2 km west). 86 stations lie within 10 km in all. Of the five, Mortlake is the most punctual at 89.5% and Barnes Bridge the least at 87.6%, with Barnes on 88.2%.
Barnes is one of 3 stations named after an area of London called Barnes; this one stands 0.9 km from its centre.
Across the whole run of data, the weakest four-week period for Barnes was Period 9 of 2024-25, at 70.0%, some time before the latest year. The strongest was Period 1 of 2026-27, at 92.1%, and the two are 22.1 percentage points apart. Cancellations peaked at 7.6% of scheduled stops in Period 2 of 2026-27, against 3.5% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Barnes is the least punctual, at 88.2%. All of them are ahead, including Essex Road (91.8%), Old Street (90.2%) and Moorgate (89.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 69,427 | 88.2% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Barnes? Delay Repay
These operators call at Barnes and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,386 | 89.8% | 2.7% |
| Period 6 of 2026-27 | 5,306 | 89.7% | 2.5% |
| Period 5 of 2026-27 | 5,324 | 87.8% | 3.5% |
| Period 4 of 2026-27 | 5,336 | 88.2% | 3.0% |
| Period 3 of 2026-27 | 5,166 | 87.9% | 2.9% |
| Period 2 of 2026-27 | 5,136 | 87.3% | 7.6% |
| Period 1 of 2026-27 | 6,213 | 92.1% | 2.7% |
| Period 13 of 2025-26 | 5,921 | 91.9% | 1.7% |
| Period 12 of 2025-26 | 5,202 | 90.3% | 4.8% |
| Period 11 of 2025-26 | 5,363 | 89.8% | 2.5% |
| Period 10 of 2025-26 | 4,404 | 88.1% | 3.8% |
| Period 9 of 2025-26 | 5,336 | 81.7% | 2.6% |
| Period 8 of 2025-26 | 5,334 | 81.3% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Essex Road | 70,053 | 91.8% | 4.9% |
| Old Street | 70,117 | 90.2% | 4.9% |
| Moorgate | 70,140 | 89.1% | 4.9% |