Old Street
OLDLondonManaged by London Underground
How this station is performing
Old Street had 70,117 scheduled stops to Period 7 of 2026-27, about 193 a day. 90.2% of recorded arrivals were within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Old Street opened on 14 February 1904, 122 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Farringdon is the oldest (1863) and Hoxton the newest (2010), with Old Street in between.
The nearest stations to Old Street are Moorgate (0.8 km south), London Liverpool Street (0.9 km south-east), Shoreditch High Street (0.9 km east), Hoxton (1.1 km north-east) and Farringdon (1.3 km south-west). 136 stations lie within 10 km in all. Of the five, Shoreditch High Street is the most punctual at 92.0% and Farringdon the least at 86.9%, with Old Street on 90.2%.
For Old Street, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 78.0% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 94.4%, which is 16.4 percentage points higher.
1 of 3 stations of a similar size in London are more punctual than Old Street on 90.2%. The comparison group includes Moorgate (89.1%), Essex Road (91.8%) and Shepherd's Bush (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 70,117 | 90.2% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Old Street? Delay Repay
These operators call at Old Street and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,472 | 88.3% | 4.9% |
| Period 6 of 2026-27 | 5,412 | 78.0% | 9.1% |
| Period 5 of 2026-27 | 5,351 | 90.3% | 6.9% |
| Period 4 of 2026-27 | 5,485 | 90.0% | 6.2% |
| Period 3 of 2026-27 | 5,395 | 91.8% | 7.2% |
| Period 2 of 2026-27 | 5,232 | 91.2% | 5.3% |
| Period 1 of 2026-27 | 6,152 | 93.6% | 4.3% |
| Period 13 of 2025-26 | 6,062 | 92.9% | 2.9% |
| Period 12 of 2025-26 | 4,929 | 93.3% | 2.1% |
| Period 11 of 2025-26 | 5,357 | 93.3% | 3.3% |
| Period 10 of 2025-26 | 4,469 | 92.9% | 3.2% |
| Period 9 of 2025-26 | 5,349 | 86.4% | 5.6% |
| Period 8 of 2025-26 | 5,452 | 89.6% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Moorgate | 70,140 | 89.1% | 4.9% |
| Essex Road | 70,053 | 91.8% | 4.9% |
| Shepherd's Bush | 70,243 | 86.1% | 9.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out