Bamford
BAMEast MidlandsManaged by Northern Trains
How this station is performing
Bamford had 11,929 scheduled stops to Period 7 of 2026-27, about 33 a day. 68.0% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Bamford opened on 25 June 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bamford is the newest; the oldest, Dore and Totley, opened in 1872.
The nearest stations to Bamford are Hope (Derbyshire) (2.8 km west), Hathersage (2.9 km south-east), Grindleford (5.6 km south-east), Edale (9.0 km west) and Dore and Totley (11.6 km east). 4 stations lie within 10 km in all. Of the five, Edale is the most punctual at 72.2% and Dore and Totley the least at 67.2%, with Bamford on 68.0%.
Bamford is one of 2 stations named after a Village called Bamford, home to about 1,241 people; this one stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Bamford was Period 9 of 2023-24, at 51.7%, some time before the latest year. The strongest was Period 3 of 2024-25, at 80.0%, and the two are 28.3 percentage points apart. Cancellations peaked at 11.4% of scheduled stops in Period 8 of 2024-25, against 1.9% over the latest 13 periods.
Compared with 3 stations of a similar size in East Midlands, Bamford is the least punctual, at 68.0%. All of them are ahead, including Hathersage (68.7%), Hope (Derbyshire) (68.7%) and Grindleford (71.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,376 | 68.2% | 1.9% |
| East Midlands Railway | 553 | – | – |
Operators with their own page for this station are linked to it.
Late train at Bamford? Delay Repay
These operators call at Bamford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 928 | 69.8% | 1.2% |
| Period 6 of 2026-27 | 928 | 68.4% | 1.0% |
| Period 5 of 2026-27 | 925 | 63.3% | 2.8% |
| Period 4 of 2026-27 | 922 | 67.4% | 0.5% |
| Period 3 of 2026-27 | 915 | 62.6% | 0.8% |
| Period 2 of 2026-27 | 908 | 65.9% | 4.0% |
| Period 1 of 2026-27 | 1,036 | 68.8% | 2.9% |
| Period 13 of 2025-26 | 870 | 74.2% | 0.6% |
| Period 12 of 2025-26 | 913 | 73.4% | 0.3% |
| Period 11 of 2025-26 | 882 | 77.5% | 2.0% |
| Period 10 of 2025-26 | 843 | 65.3% | 3.3% |
| Period 9 of 2025-26 | 931 | 63.0% | 3.2% |
| Period 8 of 2025-26 | 928 | 64.9% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hathersage | 12,034 | 68.7% | 1.9% |
| Hope (Derbyshire) | 12,034 | 68.7% | 1.9% |
| Grindleford | 12,038 | 71.0% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out