Northern at Bamford
How this operator is doing here
Northern had 11,376 scheduled stops at Bamford in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 68.2% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
Northern trains at Bamford also serve Hope (Derbyshire) (2.8 km west, 69.5% on time, 1.9% cancelled), Hathersage (2.9 km south-east, 69.7% on time, 1.9% cancelled), Grindleford (5.6 km south-east, 71.8% on time, 2.0% cancelled), Edale (9.0 km west, 73.3% on time, 1.9% cancelled), Dore and Totley (11.6 km east, 72.2% on time, 2.0% cancelled) and Dove Holes (14.0 km west, 89.2% on time, 2.1% cancelled), which are the stations on its network closest to Bamford.
Within 30 km of here, Northern runs best at Rose Hill Marple, 26.5 km west (93.3%), and worst at Hope (Derbyshire), 2.8 km west (69.5%).
The busiest Northern station within 30 km of Bamford is Sheffield, 15.7 km east, with about 320 scheduled stops a day.
Of the 1 operators with enough records at Bamford, Northern is the most punctual, at 68.2%.
For Northern, Bamford is the 448th best of 493 ranked stations. Its 68.2% here is 10.4 percentage points below the 78.6% across the whole network.
Over three full railway years Northern at Bamford has got worse each time, from 72.7% within three minutes in 2023-24 to 70.8% in 2024-25 and 70.6% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 876 | 70.3% | 1.1% |
| Period 6 of 2026-27 | 876 | 69.0% | 0.9% |
| Period 5 of 2026-27 | 880 | 62.4% | 3.0% |
| Period 4 of 2026-27 | 876 | 67.4% | 0.5% |
| Period 3 of 2026-27 | 875 | 63.1% | 0.7% |
| Period 2 of 2026-27 | 880 | 66.9% | 4.1% |
| Period 1 of 2026-27 | 1,004 | 69.7% | 2.9% |
| Period 13 of 2025-26 | 844 | 75.3% | 0.6% |
| Period 12 of 2025-26 | 880 | 74.5% | 0.3% |
| Period 11 of 2025-26 | 833 | 77.4% | 2.2% |
| Period 10 of 2025-26 | 796 | 64.8% | 3.4% |
| Period 9 of 2025-26 | 880 | 62.2% | 3.2% |
| Period 8 of 2025-26 | 876 | 64.5% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bamford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 553 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out