Hope (Derbyshire)
HOPEast MidlandsManaged by Northern Trains
How this station is performing
Hope (Derbyshire) had 12,034 scheduled stops to Period 7 of 2026-27, about 33 a day. 68.7% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Hope (Derbyshire) opened on 25 June 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hope (Derbyshire) is the newest; the oldest, Dove Holes, opened in 1863.
The nearest stations to Hope (Derbyshire) are Bamford (2.8 km east), Hathersage (5.6 km south-east), Edale (6.2 km west), Grindleford (8.2 km south-east) and Dove Holes (11.8 km south-west). 4 stations lie within 10 km in all. Of the five, Dove Holes is the most punctual at 89.2% and Bamford the least at 68.0%, with Hope (Derbyshire) on 68.7%.
Hope (Derbyshire) is named after Hope, a Village, home to about 864 people, but the station stands 1.0 km from its centre.
2 operators call at Hope (Derbyshire): Northern (69.5%, 95% of stops) and East Midlands Railway (63.8%, 5% of stops). The operator you travel with matters: Northern reaches 69.5% within three minutes while East Midlands Railway manages 63.8%, a gap of 5.7 percentage points.
2 of 3 stations of a similar size in East Midlands are more punctual than Hope (Derbyshire) on 68.7%. The comparison group includes Hathersage (68.7%), Grindleford (71.0%) and Edale (72.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,376 | 69.5% | 1.9% |
| East Midlands Railway | 658 | 63.8% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Hope (Derbyshire)? Delay Repay
These operators call at Hope (Derbyshire) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 928 | 66.0% | 1.2% |
| Period 6 of 2026-27 | 928 | 66.5% | 1.0% |
| Period 5 of 2026-27 | 925 | 60.9% | 2.8% |
| Period 4 of 2026-27 | 922 | 66.3% | 0.5% |
| Period 3 of 2026-27 | 927 | 60.7% | 0.8% |
| Period 2 of 2026-27 | 932 | 65.5% | 4.0% |
| Period 1 of 2026-27 | 1,064 | 74.5% | 2.9% |
| Period 13 of 2025-26 | 894 | 75.2% | 0.6% |
| Period 12 of 2025-26 | 930 | 75.5% | 0.4% |
| Period 11 of 2025-26 | 882 | 77.9% | 2.0% |
| Period 10 of 2025-26 | 843 | 69.8% | 3.3% |
| Period 9 of 2025-26 | 931 | 65.1% | 3.1% |
| Period 8 of 2025-26 | 928 | 69.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hathersage | 12,034 | 68.7% | 1.9% |
| Grindleford | 12,038 | 71.0% | 1.9% |
| Edale | 12,059 | 72.2% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out