ScotRail at Aviemore
How this operator is doing here
ScotRail had 7,326 scheduled stops at Aviemore in the 13 periods to Period 7 of 2026-27, 85% of the station's total. 71.8% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
ScotRail trains at Aviemore also serve Carrbridge (10.1 km north, 68.1% on time, 1.2% cancelled), Kingussie (18.3 km south-west, 60.5% on time, 1.1% cancelled), Newtonmore (22.6 km south-west, – on time, 1.0% cancelled), Dalwhinnie (37.8 km south-west, 51.9% on time, 1.2% cancelled), Inverness (40.2 km north-west, 87.3% on time, 2.1% cancelled) and Inverness Airport (40.7 km north, 85.5% on time, 2.3% cancelled), which are the stations on its network closest to Aviemore.
The busiest ScotRail station within 30 km of Aviemore is Kingussie, 18.3 km south-west, with about 20 scheduled stops a day.
Of the 2 operators with enough records at Aviemore, ScotRail is the most punctual, at 71.8%.
For ScotRail, Aviemore is the 294th best of 312 ranked stations. Its 71.8% here is 16.1 percentage points below the 87.9% across the whole network.
ScotRail at Aviemore has edged up: 71.8% of stops came within three minutes of the timetable in the latest 13 periods, 1.9 percentage points better than the 69.9% of the 13 before. Cancellations fell to 1.1% of scheduled stops from 2.0%, which is 0.9 percentage points fewer.
Over three full railway years ScotRail at Aviemore has got worse each time, from 72.1% within three minutes in 2023-24 to 70.7% in 2024-25 and 69.6% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 552 | 61.8% | 0.9% |
| Period 6 of 2026-27 | 552 | 75.6% | 0.5% |
| Period 5 of 2026-27 | 552 | 71.7% | 2.5% |
| Period 4 of 2026-27 | 552 | 68.4% | 0.7% |
| Period 3 of 2026-27 | 552 | 74.4% | 0.2% |
| Period 2 of 2026-27 | 564 | 78.7% | 0.7% |
| Period 1 of 2026-27 | 662 | 80.9% | 2.0% |
| Period 13 of 2025-26 | 630 | 79.9% | 1.1% |
| Period 12 of 2025-26 | 576 | 81.4% | 0.3% |
| Period 11 of 2025-26 | 570 | 68.0% | 3.0% |
| Period 10 of 2025-26 | 497 | 70.0% | 0.0% |
| Period 9 of 2025-26 | 571 | 62.9% | 1.1% |
| Period 8 of 2025-26 | 496 | 54.0% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Aviemore
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 710 | 68.0% | 0.7% |
| Caledonian Sleeper | 618 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out