CrossCountry had 1,132 scheduled stops at Attenborough in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 90.8% of recorded arrivals came within three minutes and 5.8% of stops were cancelled.
CrossCountry trains at Attenborough also serve Beeston (2.3 km north-east, 75.5% on time, 7.3% cancelled), Long Eaton (4.4 km south-west, 72.2% on time, 7.5% cancelled), Nottingham (7.4 km north-east, 79.7% on time, 8.1% cancelled), Spondon (12.0 km west, 83.7% on time, 5.3% cancelled), Derby (15.5 km west, 65.0% on time, 5.4% cancelled) and Willington (23.1 km west, 72.2% on time, 6.5% cancelled), which are the stations on its network closest to Attenborough.
Within 30 km of here, CrossCountry runs best at Nottingham, 7.4 km north-east (79.7%), and worst at Melton Mowbray, 28.3 km south-east (63.9%).
The busiest CrossCountry station within 30 km of Attenborough is Derby, 15.5 km west, with about 103 scheduled stops a day.
Of the 2 operators with enough records at Attenborough, CrossCountry is the most punctual, at 90.8%.
CrossCountry at Attenborough has edged up: 90.8% of stops came within three minutes of the timetable in the latest 13 periods, 4.6 percentage points better than the 86.2% of the 13 before. Cancellations fell to 5.8% of scheduled stops from 8.0%, which is 2.2 percentage points fewer.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 88 | 94.1% | 3.4% |
| Period 6 of 2026-27 | 88 | 87.1% | 2.3% |
| Period 5 of 2026-27 | 79 | 92.1% | 3.8% |
| Period 4 of 2026-27 | 84 | 92.6% | 3.6% |
| Period 3 of 2026-27 | 86 | 91.0% | 8.1% |
| Period 2 of 2026-27 | 88 | 92.9% | 3.4% |
| Period 1 of 2026-27 | 102 | 93.6% | 7.8% |
| Period 13 of 2025-26 | 96 | 88.9% | 6.3% |
| Period 12 of 2025-26 | 88 | 87.2% | 2.3% |
| Period 11 of 2025-26 | 86 | 98.8% | 7.0% |
| Period 10 of 2025-26 | 74 | 96.7% | 18.9% |
| Period 9 of 2025-26 | 87 | 79.3% | 5.7% |
| Period 8 of 2025-26 | 86 | 87.8% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Attenborough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 22,468 | 81.2% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out