East Midlands Railway had 22,468 scheduled stops at Attenborough in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 81.2% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
East Midlands Railway trains at Attenborough also serve Beeston (2.3 km north-east, 78.7% on time, 3.6% cancelled), Long Eaton (4.4 km south-west, 71.1% on time, 2.7% cancelled), East Midlands Parkway (5.4 km south-west, 65.7% on time, 4.7% cancelled), Nottingham (7.4 km north-east, 76.9% on time, 3.0% cancelled), Ilkeston (9.2 km north-west, 66.6% on time, 3.5% cancelled) and Bulwell (10.6 km north, 87.6% on time, 2.6% cancelled), which are the stations on its network closest to Attenborough.
Within 30 km of here, East Midlands Railway runs best at Newstead, 18.2 km north (88.2%), and worst at Alfreton, 23.6 km north-west (63.1%).
The busiest East Midlands Railway station within 30 km of Attenborough is Nottingham, 7.4 km north-east, with about 276 scheduled stops a day.
East Midlands Railway at Attenborough improved sharply over the past year. In the latest 13 periods 81.2% of stops came within three minutes of the timetable, up 5.0 percentage points from 76.2% in the 13 before. Cancellations held steady at 2.5% of scheduled stops, against 2.1% before.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,768 | 80.7% | 1.6% |
| Period 6 of 2026-27 | 1,755 | 82.8% | 3.9% |
| Period 5 of 2026-27 | 1,742 | 79.1% | 3.8% |
| Period 4 of 2026-27 | 1,682 | 82.3% | 2.8% |
| Period 3 of 2026-27 | 1,665 | 80.2% | 3.1% |
| Period 2 of 2026-27 | 1,760 | 84.4% | 3.6% |
| Period 1 of 2026-27 | 2,044 | 82.7% | 3.0% |
| Period 13 of 2025-26 | 1,908 | 82.7% | 1.6% |
| Period 12 of 2025-26 | 1,753 | 86.7% | 0.9% |
| Period 11 of 2025-26 | 1,749 | 88.2% | 2.2% |
| Period 10 of 2025-26 | 1,557 | 80.6% | 1.7% |
| Period 9 of 2025-26 | 1,523 | 69.5% | 2.5% |
| Period 8 of 2025-26 | 1,562 | 72.9% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Attenborough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 1,132 | 90.8% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out