CrossCountry at Ashchurch for Tewkesbury
All trains at Ashchurch for TewkesburyCrossCountry across BritainSouth West
How this operator is doing here
CrossCountry had 2,853 scheduled stops at Ashchurch for Tewkesbury in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 55.8% of recorded arrivals came within three minutes and 9.3% of stops were cancelled.
CrossCountry trains at Ashchurch for Tewkesbury also serve Cheltenham Spa (11.4 km south, 60.3% on time, 6.8% cancelled), Gloucester (17.3 km south-west, 68.9% on time, 11.9% cancelled), Worcestershire Parkway (17.8 km north, 62.1% on time, 7.8% cancelled), Worcester Shrub Hill (22.9 km north, – on time, – cancelled), Bromsgrove (35.9 km north, – on time, – cancelled) and Lydney (42.9 km south-west, 74.7% on time, 13.3% cancelled), which are the stations on its network closest to Ashchurch for Tewkesbury.
Within 30 km of here, CrossCountry runs best at Gloucester, 17.3 km south-west (68.9%), and worst at Cheltenham Spa, 11.4 km south (60.3%).
The busiest CrossCountry station within 30 km of Ashchurch for Tewkesbury is Cheltenham Spa, 11.4 km south, with about 84 scheduled stops a day.
CrossCountry at Ashchurch for Tewkesbury has slipped sharply. 55.8% of stops came within three minutes of the timetable in the latest 13 periods, 6.2 percentage points worse than the 62.0% recorded in the 13 before. Cancellations held steady at 9.3% of scheduled stops, against 8.9% before.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 208 | 46.0% | 9.1% |
| Period 6 of 2026-27 | 232 | 48.8% | 9.1% |
| Period 5 of 2026-27 | 202 | 42.5% | 7.9% |
| Period 4 of 2026-27 | 232 | 47.8% | 10.8% |
| Period 3 of 2026-27 | 207 | 57.2% | 13.0% |
| Period 2 of 2026-27 | 232 | 60.5% | 15.9% |
| Period 1 of 2026-27 | 268 | 63.1% | 4.9% |
| Period 13 of 2025-26 | 252 | 64.2% | 4.8% |
| Period 12 of 2025-26 | 232 | 69.4% | 4.3% |
| Period 11 of 2025-26 | 225 | 65.7% | 5.3% |
| Period 10 of 2025-26 | 194 | 58.3% | 19.6% |
| Period 9 of 2025-26 | 188 | 39.6% | 15.4% |
| Period 8 of 2025-26 | 181 | 52.6% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ashchurch for Tewkesbury
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 10,562 | 62.5% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out