Alloa
ALOScotlandManaged by ScotRail
How this station is performing
Alloa had 23,462 scheduled stops to Period 7 of 2026-27, about 64 a day. 95.6% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Alloa opened on 28 August 1850 and closed to passengers on 7 October 1968. It reopened on 19 May 2008, 18 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Stirling is the oldest (1848) and Camelon the newest (1903), with Alloa in between.
The nearest stations to Alloa are Stirling (9.1 km west), Larbert (11.0 km south), Bridge of Allan (11.3 km west), Camelon (12.6 km south) and Falkirk Grahamston (12.9 km south). 1 stations lie within 10 km in all. At 95.6%, Alloa is more punctual than every one of them; the best of the five, Camelon, manages 93.8%.
Alloa is one of 2 stations named after a town called Alloa, home to about 14,440 people; this one stands 0.3 km from its centre.
Alloa is among the most punctual stations in Britain. Its 95.6% puts it 103rd out of 2,374 ranked stations, with 102 ahead of it and 2,271 behind, and 11.7 percentage points above the national median of 83.9%.
1 of 3 stations of a similar size in Scotland are more punctual than Alloa on 95.6%. The comparison group includes Lanark (85.8%), Leuchars (For St. Andrews) (74.1%) and Bogston (95.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,462 | 95.6% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Alloa? Delay Repay
These operators call at Alloa and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,800 | 95.2% | 0.8% |
| Period 6 of 2026-27 | 1,800 | 95.3% | 1.2% |
| Period 5 of 2026-27 | 1,800 | 94.9% | 1.1% |
| Period 4 of 2026-27 | 1,800 | 96.0% | 2.2% |
| Period 3 of 2026-27 | 1,800 | 95.4% | 1.8% |
| Period 2 of 2026-27 | 1,798 | 97.3% | 1.2% |
| Period 1 of 2026-27 | 2,077 | 96.5% | 1.2% |
| Period 13 of 2025-26 | 1,964 | 96.6% | 1.3% |
| Period 12 of 2025-26 | 1,796 | 96.8% | 2.1% |
| Period 11 of 2025-26 | 1,696 | 94.6% | 0.9% |
| Period 10 of 2025-26 | 1,543 | 95.5% | 1.2% |
| Period 9 of 2025-26 | 1,792 | 93.7% | 1.5% |
| Period 8 of 2025-26 | 1,796 | 94.4% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lanark | 23,489 | 85.8% | 1.7% |
| Leuchars (For St. Andrews) | 23,503 | 74.1% | 1.5% |
| Bogston | 23,534 | 95.9% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out