Abergavenny
AGVWalesManaged by TfW Rail
How this station is performing
Abergavenny had 19,452 scheduled stops to Period 7 of 2026-27, about 53 a day. 66.9% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Abergavenny opened on 2 January 1854, 172 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Abergavenny is the oldest; the next oldest, Pontypool and New Inn, dates from 1854.
Abergavenny is remote: its nearest neighbours are Pontypool and New Inn (13.4 km south), Ebbw Vale Town (14.1 km west), Ebbw Vale Parkway (14.5 km south-west), Llanhilleth (15.6 km south-west) and Cwmbran (17.8 km south). At 66.9%, Abergavenny is less punctual than all of them; the best of the five, Ebbw Vale Town, manages 88.8%.
Abergavenny takes its name from a market town called Abergavenny, home to about 10,766 people, and the station stands 1.8 km from its centre.
Across the whole run of data, the weakest four-week period for Abergavenny was Period 9 of 2023-24, at 42.5%, some time before the latest year. The strongest was Period 1 of 2026-27, at 76.0%, and the two are 33.5 percentage points apart. Cancellations peaked at 9.6% of scheduled stops in Period 9 of 2024-25, against 3.1% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Abergavenny is the least punctual, at 66.9%. All of them are ahead, including Cwmbran (68.2%), Pontyclun (69.0%) and Llanharan (69.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 19,452 | 66.9% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Abergavenny? Delay Repay
These operators call at Abergavenny and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,506 | 64.9% | 2.1% |
| Period 6 of 2026-27 | 1,524 | 62.8% | 2.8% |
| Period 5 of 2026-27 | 1,429 | 58.3% | 5.0% |
| Period 4 of 2026-27 | 1,424 | 62.9% | 4.3% |
| Period 3 of 2026-27 | 1,455 | 69.8% | 2.2% |
| Period 2 of 2026-27 | 1,502 | 71.4% | 2.5% |
| Period 1 of 2026-27 | 1,741 | 76.0% | 2.0% |
| Period 13 of 2025-26 | 1,650 | 75.3% | 3.0% |
| Period 12 of 2025-26 | 1,508 | 75.3% | 1.3% |
| Period 11 of 2025-26 | 1,477 | 74.3% | 4.7% |
| Period 10 of 2025-26 | 1,374 | 65.0% | 2.4% |
| Period 9 of 2025-26 | 1,362 | 47.6% | 5.5% |
| Period 8 of 2025-26 | 1,500 | 60.6% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out