Abercynon
ACYWalesManaged by TfW Rail
How this station is performing
Abercynon had 42,353 scheduled stops to Period 7 of 2026-27, about 116 a day. 92.9% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Abercynon opened on 8 October 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Abercynon is the oldest; the next oldest, Pontypridd, dates from 1840.
The nearest stations to Abercynon are Quakers Yard (2.1 km north), Penrhiwceiber (3.7 km north-west), Pontypridd (4.9 km south), Merthyr Vale (4.9 km north) and Trehafod (5.1 km south-west). 24 stations lie within 10 km in all. Of the five, Trehafod is the most punctual at 96.1% and Penrhiwceiber the least at 89.6%, with Abercynon on 92.9%.
Abercynon takes its name from a Village called Abercynon, home to about 6,428 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Abercynon was Period 2 of 2023-24, at 72.8%, some time before the latest year. The strongest was Period 13 of 2025-26, at 96.2%, and the two are 23.4 percentage points apart. Cancellations peaked at 15.3% of scheduled stops in Period 1 of 2023-24, against 1.7% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Abercynon is the most punctual, at 92.9%. The comparison group includes Llandudno Junction (83.3%), Barry Docks (89.8%) and Cadoxton (90.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 42,353 | 92.9% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Abercynon? Delay Repay
These operators call at Abercynon and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,363 | 92.4% | 2.5% |
| Period 6 of 2026-27 | 3,404 | 92.0% | 2.9% |
| Period 5 of 2026-27 | 2,288 | 91.2% | 1.8% |
| Period 4 of 2026-27 | 3,355 | 91.1% | 1.3% |
| Period 3 of 2026-27 | 3,417 | 92.1% | 3.2% |
| Period 2 of 2026-27 | 3,406 | 93.7% | 3.1% |
| Period 1 of 2026-27 | 3,942 | 95.2% | 0.8% |
| Period 13 of 2025-26 | 3,732 | 96.2% | 0.7% |
| Period 12 of 2025-26 | 3,411 | 93.6% | 0.8% |
| Period 11 of 2025-26 | 2,174 | 93.6% | 0.9% |
| Period 10 of 2025-26 | 3,053 | 90.2% | 2.0% |
| Period 9 of 2025-26 | 3,408 | 91.1% | 1.3% |
| Period 8 of 2025-26 | 3,400 | 94.4% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Llandudno Junction | 43,153 | 83.3% | 2.3% |
| Barry Docks | 43,451 | 89.8% | 3.2% |
| Cadoxton | 43,451 | 90.3% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out