Ynyswen
YNWWalesManaged by TfW Rail
How this station is performing
Ynyswen has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 16,837 scheduled stops, about 46 a day. In those periods 97.8% of stops arrived within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Ynyswen opened on 29 September 1986, 40 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ynyswen is the newest; the oldest, Ton Pentre, opened in 1861.
The nearest stations to Ynyswen are Treherbert (1.2 km north-west), Treorchy (1.4 km south-east), Ton Pentre (3.1 km south-east), Ystrad Rhondda (4.4 km south-east) and Llwynypia (5.9 km south-east). 11 stations lie within 10 km in all. Of the five, Treherbert is the most punctual at 98.1% and Ystrad Rhondda the least at 95.9%, with Ynyswen on 97.8%.
Ynyswen is one of 2 stations named after a Village called Ynyswen; this one stands 0.4 km from its centre.
Ynyswen is among the most punctual stations in Britain. Its 97.8% puts it 21st out of 2,374 ranked stations, with 20 ahead of it and 2,353 behind, and 13.9 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in Wales, Ynyswen is the most punctual, at 97.8%. The comparison group includes Machynlleth (77.4%), Chepstow (71.9%) and Dovey Junction (79.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 16,837 | 97.8% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Ynyswen? Delay Repay
These operators call at Ynyswen and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,563 | 98.1% | 2.2% |
| Period 6 of 2026-27 | 1,651 | 98.3% | 3.3% |
| Period 5 of 2026-27 | 696 | 99.1% | 1.1% |
| Period 4 of 2026-27 | 1,661 | 97.8% | 1.1% |
| Period 3 of 2026-27 | 1,624 | 97.5% | 2.3% |
| Period 2 of 2026-27 | 1,650 | 98.3% | 1.6% |
| Period 1 of 2026-27 | 1,854 | 98.3% | 4.5% |
| Period 13 of 2025-26 | 1,808 | 98.6% | 0.4% |
| Period 12 of 2025-26 | 1,652 | 96.4% | 1.6% |
| Period 11 of 2025-26 | 1,638 | 97.1% | 1.2% |
| Period 10 of 2025-26 | 1,040 | 96.6% | 0.9% |
| Period 9 of 2025-26 | 0 | – | – |
| Period 8 of 2025-26 | 0 | – | – |
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Machynlleth | 16,570 | 77.4% | 3.3% |
| Chepstow | 17,177 | 71.9% | 6.7% |
| Dovey Junction | 16,179 | 79.8% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out