Machynlleth
MCNWalesManaged by TfW Rail
How this station is performing
Machynlleth had 16,570 scheduled stops to Period 7 of 2026-27, about 46 a day. 77.4% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Machynlleth opened on 5 January 1863, 163 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Machynlleth is the oldest; the next oldest, Tywyn, dates from 1863.
The nearest stations to Machynlleth are Dovey Junction (5.8 km south-west), Penhelig (13.4 km south-west), Aberdovey (14.7 km west), Tywyn (16.2 km west) and Fairbourne (17.3 km north-west). 1 stations lie within 10 km in all. Of the five, Tywyn is the most punctual at 83.2% and Penhelig the least at 68.4%, with Machynlleth on 77.4%.
Machynlleth takes its name from a town called Machynlleth, home to about 2,235 people, and the station stands 0.6 km from its centre.
For Machynlleth, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 56.8% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2024-25, at 91.0%, which is 34.2 percentage points higher. Cancellations peaked at 8.8% of scheduled stops in Period 9 of 2024-25, against 3.3% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Machynlleth on 77.4%. The comparison group includes Ynyswen (97.8%), Dovey Junction (79.8%) and Chepstow (71.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 16,570 | 77.4% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Machynlleth? Delay Repay
These operators call at Machynlleth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,279 | 81.3% | 2.7% |
| Period 6 of 2026-27 | 1,305 | 69.2% | 3.1% |
| Period 5 of 2026-27 | 1,256 | 56.8% | 4.7% |
| Period 4 of 2026-27 | 1,127 | 63.3% | 5.5% |
| Period 3 of 2026-27 | 1,254 | 79.3% | 4.5% |
| Period 2 of 2026-27 | 1,236 | 74.9% | 4.4% |
| Period 1 of 2026-27 | 1,486 | 83.3% | 1.8% |
| Period 13 of 2025-26 | 1,439 | 88.5% | 1.1% |
| Period 12 of 2025-26 | 1,160 | 87.9% | 2.0% |
| Period 11 of 2025-26 | 1,230 | 87.6% | 4.1% |
| Period 10 of 2025-26 | 1,196 | 80.8% | 5.4% |
| Period 9 of 2025-26 | 1,301 | 77.7% | 2.8% |
| Period 8 of 2025-26 | 1,301 | 72.6% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ynyswen | 16,837 | 97.8% | 1.9% |
| Dovey Junction | 16,179 | 79.8% | 3.9% |
| Chepstow | 17,177 | 71.9% | 6.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out