TransPennine Express at Yarm
All trains at YarmTransPennine Express across BritainNorth East
How this operator is doing here
TransPennine Express had 12,102 scheduled stops at Yarm in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 61.4% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
TransPennine Express trains at Yarm also serve Eaglescliffe (4.0 km north, 68.1% on time, 1.8% cancelled), Thornaby (8.0 km north-east, 70.2% on time, 2.1% cancelled), Middlesbrough (12.1 km north-east, 72.8% on time, 6.2% cancelled), Darlington (13.0 km west, 74.7% on time, 3.3% cancelled), Northallerton (18.9 km south, 68.6% on time, 2.3% cancelled) and Redcar Central (22.7 km north-east, 73.8% on time, 10.7% cancelled), which are the stations on its network closest to Yarm.
Within 30 km of here, TransPennine Express runs best at Darlington, 13.0 km west (74.7%), and worst at Thirsk, 29.5 km south (68.0%).
The busiest TransPennine Express station within 30 km of Yarm is Northallerton, 18.9 km south, with about 41 scheduled stops a day.
Of the 1 operators with enough records at Yarm, TransPennine Express is the most punctual, at 61.4%.
Over three full railway years TransPennine Express at Yarm has got worse each time, from 68.6% within three minutes in 2023-24 to 68.1% in 2024-25 and 63.3% in 2025-26.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 951 | 57.2% | 1.8% |
| Period 6 of 2026-27 | 940 | 60.3% | 1.6% |
| Period 5 of 2026-27 | 944 | 57.6% | 3.0% |
| Period 4 of 2026-27 | 949 | 58.8% | 1.4% |
| Period 3 of 2026-27 | 952 | 68.1% | 0.2% |
| Period 2 of 2026-27 | 788 | 56.4% | 2.5% |
| Period 1 of 2026-27 | 1,047 | 62.4% | 2.0% |
| Period 13 of 2025-26 | 1,050 | 67.5% | 1.1% |
| Period 12 of 2025-26 | 952 | 63.2% | 0.8% |
| Period 11 of 2025-26 | 950 | 65.8% | 1.7% |
| Period 10 of 2025-26 | 871 | 64.3% | 0.1% |
| Period 9 of 2025-26 | 919 | 55.8% | 1.8% |
| Period 8 of 2025-26 | 789 | 57.9% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out