Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Wressle

WRSYorkshire and The HumberManaged by Northern Trains

On time, last 13 periods76.9%Great Britain: 83.6%
Cancelled1.6%Great Britain: 3.2%
Stops a day7Scheduled, on average
Punctuality rank1736th of 2,374Among ranked stations

How this station is performing

Wressle has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 2,416 scheduled stops, about 7 a day. In those periods 76.9% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.

Wressle opened on 14 March 1843, 183 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Selby is the oldest (1834) and Saltmarshe the newest (1869), with Wressle in between.

The nearest stations to Wressle are Howden (4.2 km east), Goole (8.2 km south-east), Eastrington (9.2 km east), Selby (9.3 km west) and Saltmarshe (9.4 km south-east). 6 stations lie within 10 km in all. Of the five, Saltmarshe is the most punctual at 79.3% and Howden the least at 69.8%, with Wressle on 76.9%.

Wressle takes its name from a Village called Wressle, home to about 271 people, and the station stands 0.3 km from its centre.

Compared with 3 stations of a similar size in Yorkshire and The Humber, Wressle is the most punctual, at 76.9%. The comparison group includes Eastrington (76.4%), Pontefract Baghill (64.7%) and Arram (76.8%).

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 85.3%Period 2 of 2023-24: 87.1%Period 3 of 2023-24: 71.4%Period 4 of 2023-24: 74.2%Period 5 of 2023-24: 82.9%Period 6 of 2023-24: 82.6%Period 7 of 2023-24: 83.1%Period 8 of 2023-24: 63.0%Period 9 of 2023-24: 45.5%Period 10 of 2023-24: 75.8%Period 11 of 2023-24: 78.3%Period 12 of 2023-24: 80.5%Period 13 of 2023-24: 88.4%Period 1 of 2024-25: 85.7%Period 2 of 2024-25: 88.1%Period 3 of 2024-25: 78.6%Period 4 of 2024-25: 80.4%Period 5 of 2024-25: 82.5%Period 6 of 2024-25: 84.1%Period 7 of 2024-25: 73.4%Period 8 of 2024-25: 54.0%Period 9 of 2024-25: 53.1%Period 11 of 2024-25: 74.3%Period 12 of 2024-25: 74.2%Period 13 of 2024-25: 81.3%Period 1 of 2025-26: 83.0%Period 2 of 2025-26: 88.4%Period 3 of 2025-26: 86.6%Period 4 of 2025-26: 78.3%Period 5 of 2025-26: 84.3%Period 6 of 2025-26: 75.0%Period 7 of 2025-26: 75.7%Period 8 of 2025-26: 63.5%Period 9 of 2025-26: 63.2%Period 10 of 2025-26: 80.3%Period 11 of 2025-26: 72.2%Period 12 of 2025-26: 82.8%Period 13 of 2025-26: 79.8%Period 2 of 2026-27: 76.9%Period 3 of 2026-27: 78.2%Period 4 of 2026-27: 79.0%Period 5 of 2026-27: 83.0%Period 6 of 2026-27: 81.8%Period 7 of 2026-27: 78.4%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 1.1%Period 2 of 2023-24: 4.5%Period 3 of 2023-24: 1.4%Period 4 of 2023-24: 1.4%Period 5 of 2023-24: 5.0%Period 6 of 2023-24: 4.1%Period 7 of 2023-24: 3.9%Period 8 of 2023-24: 5.4%Period 9 of 2023-24: 6.8%Period 10 of 2023-24: 3.3%Period 11 of 2023-24: 1.9%Period 12 of 2023-24: 1.2%Period 13 of 2023-24: 3.0%Period 1 of 2024-25: 1.3%Period 2 of 2024-25: 3.2%Period 3 of 2024-25: 4.8%Period 4 of 2024-25: 6.0%Period 5 of 2024-25: 3.6%Period 6 of 2024-25: 2.4%Period 7 of 2024-25: 4.2%Period 8 of 2024-25: 4.2%Period 9 of 2024-25: 1.8%Period 10 of 2024-25: 2.0%Period 11 of 2024-25: 1.2%Period 12 of 2024-25: 0.6%Period 13 of 2024-25: 0.6%Period 1 of 2025-26: 0.6%Period 2 of 2025-26: 2.4%Period 3 of 2025-26: 3.0%Period 4 of 2025-26: 2.4%Period 5 of 2025-26: 1.2%Period 6 of 2025-26: 0.6%Period 7 of 2025-26: 0.6%Period 8 of 2025-26: 1.2%Period 9 of 2025-26: 4.8%Period 10 of 2025-26: 1.8%Period 11 of 2025-26: 1.1%Period 12 of 2025-26: 1.6%Period 13 of 2025-26: 0.5%Period 1 of 2026-27: 1.4%Period 2 of 2026-27: 3.2%Period 3 of 2026-27: 1.1%Period 4 of 2026-27: 0.5%Period 5 of 2026-27: 2.7%Period 6 of 2026-27: 1.1%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern2,41676.9%1.6%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2718878.4%0.0%
Period 6 of 2026-2718981.8%1.1%
Period 5 of 2026-2718883.0%2.7%
Period 4 of 2026-2718279.0%0.5%
Period 3 of 2026-2718878.2%1.1%
Period 2 of 2026-2718776.9%3.2%
Period 1 of 2026-27216–1.4%
Period 13 of 2025-2620779.8%0.5%
Period 12 of 2025-2618882.8%1.6%
Period 11 of 2025-2618372.2%1.1%
Period 10 of 2025-2616480.3%1.8%
Period 9 of 2025-2616863.2%4.8%
Period 8 of 2025-2616863.5%1.2%

Time of year

50%60%70%80%90%P1: 84.7%1P2: 85.2%2P3: 79.1%3P4: 78.2%4P5: 83.1%5P6: 80.8%6P7: 77.5%7P8: 60.0%8P9: 54.2%9P10: 78.5%10P11: 74.6%11P12: 79.3%12P13: 83.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Yorkshire and The Humber

StationScheduled stopsWithin 3 minCancelled
Eastrington2,01576.4%1.7%
Pontefract Baghill1,91264.7%1.3%
Arram3,66276.8%4.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out