How punctual is your station? Every stop, every operator, every four weeks.

Great Western Railway at Worcestershire Parkway

All trains at Worcestershire ParkwayGreat Western Railway across BritainWest Midlands

On time, last 13 periods59.4%Whole station: 61.9%
Cancelled4.0%Whole station: 6.1%
Scheduled stops14,113Of 32,360 at the station

How this operator is doing here

Great Western Railway had 14,113 scheduled stops at Worcestershire Parkway in the 13 periods to Period 7 of 2026-27, 44% of the station's total. 59.4% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.

Great Western Railway trains at Worcestershire Parkway also serve Worcester Shrub Hill (5.5 km north-west, 66.5% on time, 5.5% cancelled), Worcester Foregate Street (6.0 km north-west, 67.5% on time, 8.3% cancelled), Pershore (6.6 km south-east, 57.8% on time, 4.1% cancelled), Malvern Link (11.4 km west, 68.7% on time, 9.1% cancelled), Great Malvern (12.0 km south-west, 64.0% on time, 10.1% cancelled) and Evesham (15.8 km south-east, 58.0% on time, 4.4% cancelled), which are the stations on its network closest to Worcestershire Parkway.

Within 30 km of here, Great Western Railway runs best at Malvern Link, 11.4 km west (68.7%), and worst at Pershore, 6.6 km south-east (57.8%).

The busiest Great Western Railway station within 30 km of Worcestershire Parkway is Worcester Shrub Hill, 5.5 km north-west, with about 68 scheduled stops a day.

Great Western Railway at Worcestershire Parkway has slipped sharply. 59.4% of stops came within three minutes of the timetable in the latest 13 periods, 7.6 percentage points worse than the 67.0% recorded in the 13 before. Cancellations held steady at 4.0% of scheduled stops, against 4.1% before.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 67.5%Period 2 of 2023-24: 81.5%Period 3 of 2023-24: 64.9%Period 4 of 2023-24: 59.1%Period 5 of 2023-24: 62.4%Period 6 of 2023-24: 49.6%Period 7 of 2023-24: 60.5%Period 8 of 2023-24: 53.8%Period 9 of 2023-24: 50.2%Period 10 of 2023-24: 51.6%Period 11 of 2023-24: 60.3%Period 12 of 2023-24: 63.5%Period 13 of 2023-24: 61.9%Period 1 of 2024-25: 63.6%Period 2 of 2024-25: 58.4%Period 3 of 2024-25: 57.5%Period 4 of 2024-25: 58.2%Period 5 of 2024-25: 61.5%Period 6 of 2024-25: 55.5%Period 7 of 2024-25: 63.3%Period 8 of 2024-25: 63.2%Period 9 of 2024-25: 55.9%Period 10 of 2024-25: 68.4%Period 11 of 2024-25: 73.0%Period 12 of 2024-25: 73.3%Period 13 of 2024-25: 72.0%Period 1 of 2025-26: 74.7%Period 2 of 2025-26: 77.2%Period 3 of 2025-26: 68.0%Period 4 of 2025-26: 64.0%Period 5 of 2025-26: 65.7%Period 6 of 2025-26: 58.4%Period 7 of 2025-26: 55.3%Period 8 of 2025-26: 50.8%Period 10 of 2025-26: 45.0%Period 11 of 2025-26: 66.5%Period 13 of 2025-26: 72.6%Period 1 of 2026-27: 64.5%Period 2 of 2026-27: 62.1%Period 3 of 2026-27: 59.5%Period 4 of 2026-27: 55.3%Period 5 of 2026-27: 54.0%Period 6 of 2026-27: 54.4%Period 7 of 2026-27: 64.9%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 3.3%Period 2 of 2023-24: 2.3%Period 3 of 2023-24: 2.6%Period 4 of 2023-24: 2.9%Period 5 of 2023-24: 5.4%Period 6 of 2023-24: 3.7%Period 7 of 2023-24: 2.7%Period 8 of 2023-24: 4.0%Period 9 of 2023-24: 7.6%Period 10 of 2023-24: 6.9%Period 11 of 2023-24: 4.6%Period 12 of 2023-24: 5.1%Period 13 of 2023-24: 3.4%Period 1 of 2024-25: 3.5%Period 2 of 2024-25: 5.0%Period 3 of 2024-25: 4.5%Period 4 of 2024-25: 5.0%Period 5 of 2024-25: 5.2%Period 6 of 2024-25: 3.2%Period 7 of 2024-25: 3.2%Period 8 of 2024-25: 5.0%Period 9 of 2024-25: 7.5%Period 10 of 2024-25: 9.3%Period 11 of 2024-25: 2.9%Period 12 of 2024-25: 2.5%Period 13 of 2024-25: 3.3%Period 1 of 2025-26: 2.4%Period 2 of 2025-26: 1.7%Period 3 of 2025-26: 3.1%Period 4 of 2025-26: 2.8%Period 5 of 2025-26: 3.3%Period 6 of 2025-26: 6.1%Period 7 of 2025-26: 4.6%Period 8 of 2025-26: 4.4%Period 9 of 2025-26: 3.0%Period 10 of 2025-26: 5.0%Period 11 of 2025-26: 2.0%Period 12 of 2025-26: 1.6%Period 13 of 2025-26: 2.2%Period 1 of 2026-27: 3.3%Period 2 of 2026-27: 2.5%Period 3 of 2026-27: 6.1%Period 4 of 2026-27: 5.9%Period 5 of 2026-27: 7.5%Period 6 of 2026-27: 5.1%Period 7 of 2026-27: 3.3%2023-242024-252025-262026-27

See how Great Western Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,07664.9%3.3%
Period 6 of 2026-271,09254.4%5.1%
Period 5 of 2026-271,07954.0%7.5%
Period 4 of 2026-271,08055.3%5.9%
Period 3 of 2026-271,08659.5%6.1%
Period 2 of 2026-271,08062.1%2.5%
Period 1 of 2026-271,24064.5%3.3%
Period 13 of 2025-261,20172.6%2.2%
Period 12 of 2025-261,012–1.6%
Period 11 of 2025-261,03666.5%2.0%
Period 10 of 2025-2698745.0%5.0%
Period 9 of 2025-261,080–3.0%
Period 8 of 2025-261,06450.8%4.4%

Time of year

50%60%70%80%90%P1: 67.7%1P2: 69.6%2P3: 62.4%3P4: 59.2%4P5: 60.8%5P6: 54.4%6P7: 61.0%7P8: 56.4%8P9: 53.1%9P10: 54.9%10P11: 66.9%11P12: 68.6%12P13: 69.1%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Worcestershire Parkway

OperatorScheduled stopsWithin 3 minCancelled
CrossCountry18,24762.1%7.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out