West Midlands Railway at Worcester Shrub Hill
All trains at Worcester Shrub HillWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 17,891 scheduled stops at Worcester Shrub Hill in the 13 periods to Period 7 of 2026-27, 42% of the station's total. 81.7% of recorded arrivals came within three minutes and 4.5% of stops were cancelled.
West Midlands Railway trains at Worcester Shrub Hill also serve Worcester Foregate Street (0.8 km west, 80.9% on time, 3.9% cancelled), Droitwich Spa (8.9 km north-east, 81.6% on time, 3.3% cancelled), Malvern Link (10.8 km south-west, 76.9% on time, 2.3% cancelled), Great Malvern (12.1 km south-west, 75.6% on time, 2.5% cancelled), Hartlebury (15.5 km north, 85.0% on time, 3.8% cancelled) and Colwall (16.3 km south-west, 71.0% on time, 2.8% cancelled), which are the stations on its network closest to Worcester Shrub Hill.
Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 29.3 km north (100.0%), and worst at Colwall, 16.3 km south-west (71.0%).
The busiest West Midlands Railway station within 30 km of Worcester Shrub Hill is Stourbridge Junction, 28.5 km north, with about 308 scheduled stops a day.
Of the 2 operators with enough records at Worcester Shrub Hill, West Midlands Railway is the most punctual, at 81.7%.
Over three full railway years West Midlands Railway at Worcester Shrub Hill has improved each time, from 78.1% within three minutes in 2023-24 to 81.7% in 2024-25 and 82.8% in 2025-26.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,322 | 80.4% | 3.5% |
| Period 6 of 2026-27 | 1,358 | 80.6% | 3.2% |
| Period 5 of 2026-27 | 1,350 | 81.4% | 7.0% |
| Period 4 of 2026-27 | 1,265 | 78.4% | 5.6% |
| Period 3 of 2026-27 | 1,361 | 81.3% | 3.8% |
| Period 2 of 2026-27 | 1,293 | 84.3% | 5.6% |
| Period 1 of 2026-27 | 1,615 | 86.3% | 3.7% |
| Period 13 of 2025-26 | 1,540 | 88.2% | 4.7% |
| Period 12 of 2025-26 | 1,476 | 87.5% | 3.7% |
| Period 11 of 2025-26 | 1,406 | 85.9% | 5.5% |
| Period 10 of 2025-26 | 1,263 | 81.0% | 3.9% |
| Period 9 of 2025-26 | 1,409 | 68.3% | 5.2% |
| Period 8 of 2025-26 | 1,233 | 76.3% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Worcester Shrub Hill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 24,704 | 66.5% | 5.5% |
| CrossCountry | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out