West Midlands Railway at Wolverhampton
All trains at WolverhamptonWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 66,655 scheduled stops at Wolverhampton in the 13 periods to Period 7 of 2026-27, 56% of the station's total. 71.9% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
West Midlands Railway trains at Wolverhampton also serve Coseley (5.2 km south-east, 75.1% on time, 3.3% cancelled), Bilbrook (6.0 km north-west, 71.6% on time, 4.0% cancelled), Codsall (7.0 km north-west, 72.8% on time, 3.9% cancelled), Tipton (7.4 km south-east, 77.5% on time, 2.8% cancelled), Bloxwich (8.1 km north-east, 92.5% on time, 2.6% cancelled) and Bloxwich North (8.1 km north-east, 93.7% on time, 2.6% cancelled), which are the stations on its network closest to Wolverhampton.
Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 14.8 km south (100.0%), and worst at Tamworth, 29.8 km east (43.1%).
The busiest West Midlands Railway station within 30 km of Wolverhampton is Birmingham New Street, 19.4 km south-east, with about 532 scheduled stops a day.
West Midlands Railway at Wolverhampton has slipped a little, from 75.8% within three minutes in the previous 13 periods to 71.9% in the latest 13, a fall of 3.9 percentage points. Cancellations fell to 3.3% of scheduled stops from 3.8%, which is 0.5 percentage points fewer.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,216 | 69.6% | 1.9% |
| Period 6 of 2026-27 | 5,190 | 70.8% | 1.7% |
| Period 5 of 2026-27 | 5,178 | 69.4% | 3.2% |
| Period 4 of 2026-27 | 4,883 | 61.1% | 5.4% |
| Period 3 of 2026-27 | 4,928 | 72.3% | 2.0% |
| Period 2 of 2026-27 | 4,839 | 72.8% | 6.1% |
| Period 1 of 2026-27 | 5,917 | 78.6% | 1.9% |
| Period 13 of 2025-26 | 5,308 | 77.8% | 5.5% |
| Period 12 of 2025-26 | 5,106 | 79.2% | 1.3% |
| Period 11 of 2025-26 | 5,084 | 78.2% | 6.0% |
| Period 10 of 2025-26 | 4,646 | 74.0% | 2.0% |
| Period 9 of 2025-26 | 5,182 | 61.0% | 2.8% |
| Period 8 of 2025-26 | 5,178 | 68.9% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Wolverhampton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 21,102 | 55.7% | 5.6% |
| Avanti | 18,302 | 62.1% | 6.2% |
| Transport for Wales | 11,982 | 66.3% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out