Winchelsea
WSESouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Winchelsea has usable figures for 1 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,536 scheduled stops, about 34 a day. In those periods 88.5% of stops arrived within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Winchelsea opened on 13 February 1851, 175 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Winchelsea is the oldest; the next oldest, Rye (Sussex), dates from 1851.
The nearest stations to Winchelsea are Rye (Sussex) (2.9 km north-east), Doleham (6.7 km west), Three Oaks (7.3 km south-west), Ore (10.8 km south-west) and Hastings (12.2 km south-west). 3 stations lie within 10 km in all. At 88.5%, Winchelsea is more punctual than every one of them; the best of the five, Rye (Sussex), manages 86.6%.
Winchelsea takes its name from a market town called Winchelsea, home to about 600 people, and the station stands 1.1 km from its centre.
Across the whole run of data, the weakest four-week period for Winchelsea was Period 5 of 2023-24, at 82.8%, some time before the latest year. The strongest was Period 8 of 2024-25, at 96.1%, and the two are 13.3 percentage points apart. Cancellations peaked at 10.1% of scheduled stops in Period 8 of 2023-24, against 3.7% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,536 | 88.5% | 3.7% |
Operators with their own page for this station are linked to it.
Late train at Winchelsea? Delay Repay
These operators call at Winchelsea and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 976 | – | 5.7% |
| Period 6 of 2026-27 | 979 | – | 5.1% |
| Period 5 of 2026-27 | 940 | – | 4.6% |
| Period 4 of 2026-27 | 946 | – | 2.6% |
| Period 3 of 2026-27 | 985 | – | 5.4% |
| Period 2 of 2026-27 | 918 | – | 5.3% |
| Period 1 of 2026-27 | 1,128 | – | 1.4% |
| Period 13 of 2025-26 | 985 | – | 4.6% |
| Period 12 of 2025-26 | 919 | – | 1.8% |
| Period 11 of 2025-26 | 985 | – | 2.8% |
| Period 10 of 2025-26 | 892 | – | 3.1% |
| Period 9 of 2025-26 | 990 | – | 3.6% |
| Period 8 of 2025-26 | 893 | 88.5% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out