Whiston
WHNNorth WestManaged by Northern Trains
How this station is performing
Whiston had 14,379 scheduled stops to Period 7 of 2026-27, about 40 a day. 68.1% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Whiston opened on 1 October 1990, 36 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Whiston is the newest; the oldest, Rainhill, opened in 1830.
The nearest stations to Whiston are Prescot (1.1 km north), Rainhill (2.0 km east), Eccleston Park (2.1 km north-east), Huyton (3.1 km west) and Thatto Heath (3.5 km north-east). 21 stations lie within 10 km in all. At 68.1%, Whiston is less punctual than all of them; the best of the five, Thatto Heath, manages 90.7%.
Whiston is one of 5 stations named after a Village called Whiston, home to about 13,629 people; this one stands 0.1 km from its centre.
Whiston improved sharply over the past year. In the latest 13 periods 68.1% of stops came within three minutes of the timetable, up 5.3 percentage points from 62.8% in the 13 before. Cancellations fell to 3.1% of scheduled stops from 5.5%, which is 2.4 percentage points fewer.
Compared with 3 stations of a similar size in North West, Whiston is the least punctual, at 68.1%. All of them are ahead, including Grange-over-Sands (71.4%), Ulverston (73.8%) and Dalton (Cumbria) (73.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 14,379 | 68.1% | 3.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,116 | 68.3% | 1.8% |
| Period 6 of 2026-27 | 1,099 | 71.5% | 1.8% |
| Period 5 of 2026-27 | 1,099 | 71.0% | 4.2% |
| Period 4 of 2026-27 | 1,120 | 73.5% | 2.5% |
| Period 3 of 2026-27 | 969 | 72.2% | 2.5% |
| Period 2 of 2026-27 | 1,092 | 73.4% | 2.0% |
| Period 1 of 2026-27 | 1,280 | 72.5% | 2.1% |
| Period 13 of 2025-26 | 1,179 | 70.9% | 2.5% |
| Period 12 of 2025-26 | 1,116 | 75.9% | 2.8% |
| Period 11 of 2025-26 | 1,101 | 71.3% | 1.7% |
| Period 10 of 2025-26 | 1,016 | 62.8% | 6.4% |
| Period 9 of 2025-26 | 1,091 | 47.2% | 4.2% |
| Period 8 of 2025-26 | 1,101 | 53.0% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Grange-over-Sands | 14,376 | 71.4% | 3.1% |
| Ulverston | 14,376 | 73.8% | 3.1% |
| Dalton (Cumbria) | 14,327 | 73.5% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out