Dalton (Cumbria)
DLTNorth WestManaged by Northern Trains
How this station is performing
Dalton (Cumbria) has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 14,327 scheduled stops, about 39 a day. In those periods 73.5% of stops arrived within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Dalton (Cumbria) opened on 24 August 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dalton (Cumbria) is the oldest; the next oldest, Barrow-in-Furness, dates from 1846.
The nearest stations to Dalton (Cumbria) are Askam (4.2 km north-west), Roose (4.5 km south), Barrow-in-Furness (5.0 km south-west), Ulverston (6.8 km north-east) and Millom (8.7 km north-west). 6 stations lie within 10 km in all. Of the five, Askam is the most punctual at 81.7% and Roose the least at 73.1%, with Dalton (Cumbria) on 73.5%.
Dalton (Cumbria) is named after Dalton-in-Furness, a town, home to about 7,827 people, but the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Dalton (Cumbria) was Period 9 of 2024-25, at 64.0%, some time before the latest year. The strongest was Period 11 of 2025-26, at 81.3%, and the two are 17.3 percentage points apart. Cancellations peaked at 15.3% of scheduled stops in Period 9 of 2024-25, against 3.4% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Dalton (Cumbria) on 73.5%. The comparison group includes Arnside (67.8%), Grange-over-Sands (71.4%) and Ulverston (73.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 14,327 | 73.5% | 3.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,104 | 75.0% | 1.8% |
| Period 6 of 2026-27 | 1,088 | 74.0% | 2.4% |
| Period 5 of 2026-27 | 1,104 | 73.4% | 4.6% |
| Period 4 of 2026-27 | 1,100 | 73.4% | 3.0% |
| Period 3 of 2026-27 | 1,082 | 73.6% | 3.0% |
| Period 2 of 2026-27 | 1,104 | 75.4% | 2.6% |
| Period 1 of 2026-27 | 1,222 | – | 1.6% |
| Period 13 of 2025-26 | 1,196 | 76.9% | 4.4% |
| Period 12 of 2025-26 | 1,105 | 71.8% | 3.2% |
| Period 11 of 2025-26 | 1,106 | 81.3% | 1.4% |
| Period 10 of 2025-26 | 908 | 72.1% | 7.0% |
| Period 9 of 2025-26 | 1,104 | 68.9% | 5.8% |
| Period 8 of 2025-26 | 1,104 | 66.3% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Arnside | 14,313 | 67.8% | 3.4% |
| Grange-over-Sands | 14,376 | 71.4% | 3.1% |
| Ulverston | 14,376 | 73.8% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out