Wetheral
WRLNorth WestManaged by Northern Trains
How this station is performing
Wetheral has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 14,112 scheduled stops, about 39 a day. In those periods 78.6% of stops arrived within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Wetheral opened on 20 July 1836 and closed to passengers on 2 January 1967. It reopened on 5 October 1981, 45 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Wetheral is the oldest; the next oldest, Brampton (Cumbria), dates from 1836.
The nearest stations to Wetheral are Carlisle (6.5 km west), Armathwaite (9.1 km south-east), Brampton (Cumbria) (9.8 km north-east), Dalston (Cumbria) (10.9 km south-west) and Lazonby and Kirkoswald (16.9 km south-east). 3 stations lie within 10 km in all. Of the five, Dalston (Cumbria) is the most punctual at 93.4% and Carlisle the least at 74.7%, with Wetheral on 78.6%.
Wetheral takes its name from a Village called Wetheral, home to about 6,293 people, and the station stands 0.3 km from its centre.
Compared with 3 stations of a similar size in North West, Wetheral is the most punctual, at 78.6%. The comparison group includes Cark and Cartmel (72.5%), Silverdale (68.2%) and Arnside (67.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 14,112 | 78.6% | 3.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,112 | 77.0% | 4.5% |
| Period 6 of 2026-27 | 1,112 | 81.3% | 3.6% |
| Period 5 of 2026-27 | 1,112 | 80.6% | 4.8% |
| Period 4 of 2026-27 | 1,112 | 79.8% | 4.4% |
| Period 3 of 2026-27 | 1,112 | 84.1% | 2.1% |
| Period 2 of 2026-27 | 1,112 | 79.2% | 3.9% |
| Period 1 of 2026-27 | 1,280 | – | 3.5% |
| Period 13 of 2025-26 | 1,221 | 79.3% | 3.1% |
| Period 12 of 2025-26 | 1,112 | 82.4% | 2.1% |
| Period 11 of 2025-26 | 1,077 | 78.4% | 4.5% |
| Period 10 of 2025-26 | 927 | 63.9% | 5.3% |
| Period 9 of 2025-26 | 912 | 72.4% | 2.2% |
| Period 8 of 2025-26 | 911 | 80.2% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cark and Cartmel | 13,981 | 72.5% | 3.2% |
| Silverdale | 13,972 | 68.2% | 3.4% |
| Arnside | 14,313 | 67.8% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out