Arnside
ARNNorth WestManaged by Northern Trains
How this station is performing
Arnside had 14,313 scheduled stops to Period 7 of 2026-27, about 39 a day. 67.8% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Arnside opened on 1 August 1858, 168 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Arnside is the newest; the oldest, Carnforth, opened in 1846.
The nearest stations to Arnside are Silverdale (4.0 km south-east), Grange-over-Sands (4.9 km west), Kents Bank (7.1 km south-west), Carnforth (8.9 km south-east) and Cark and Cartmel (9.9 km west). 5 stations lie within 10 km in all. At 67.8%, Arnside is less punctual than all of them; the best of the five, Carnforth, manages 76.4%.
Arnside takes its name from a Village called Arnside, home to about 2,334 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Arnside was Period 9 of 2024-25, at 57.5%, some time before the latest year. The strongest was Period 11 of 2025-26, at 77.8%, and the two are 20.3 percentage points apart. Cancellations peaked at 15.4% of scheduled stops in Period 9 of 2024-25, against 3.4% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Arnside is the least punctual, at 67.8%. All of them are ahead, including Dalton (Cumbria) (73.5%), Grange-over-Sands (71.4%) and Ulverston (73.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 14,313 | 67.8% | 3.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,108 | 67.0% | 1.7% |
| Period 6 of 2026-27 | 1,092 | 68.3% | 2.2% |
| Period 5 of 2026-27 | 1,108 | 64.6% | 4.6% |
| Period 4 of 2026-27 | 1,104 | 65.0% | 3.0% |
| Period 3 of 2026-27 | 1,085 | 66.3% | 3.0% |
| Period 2 of 2026-27 | 1,108 | 69.9% | 2.9% |
| Period 1 of 2026-27 | 1,168 | 76.4% | 1.7% |
| Period 13 of 2025-26 | 1,201 | 71.2% | 4.4% |
| Period 12 of 2025-26 | 1,106 | 63.5% | 3.1% |
| Period 11 of 2025-26 | 1,106 | 77.8% | 1.4% |
| Period 10 of 2025-26 | 911 | 68.9% | 7.2% |
| Period 9 of 2025-26 | 1,108 | 62.0% | 5.9% |
| Period 8 of 2025-26 | 1,108 | 59.3% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dalton (Cumbria) | 14,327 | 73.5% | 3.4% |
| Grange-over-Sands | 14,376 | 71.4% | 3.1% |
| Ulverston | 14,376 | 73.8% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out