West Byfleet
WBYSouth EastManaged by South Western Railway
How this station is performing
West Byfleet had 47,795 scheduled stops to Period 7 of 2026-27, about 131 a day. 81.5% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
West Byfleet opened on 1 December 1887, 139 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Weybridge is the oldest (1838) and Byfleet and New Haw the newest (1927), with West Byfleet in between.
The nearest stations to West Byfleet are Byfleet and New Haw (2.1 km north-east), Addlestone (4.0 km north), Weybridge (4.1 km north-east), Woking (4.3 km south-west) and Chertsey (5.3 km north). 18 stations lie within 10 km in all. Of the five, Addlestone is the most punctual at 86.7% and Woking the least at 73.7%, with West Byfleet on 81.5%.
West Byfleet takes its name from a Village called West Byfleet, home to about 5,626 people, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for West Byfleet was Period 9 of 2024-25, at 66.6%, some time before the latest year. The strongest was Period 5 of 2023-24, at 93.0%, and the two are 26.4 percentage points apart. Cancellations peaked at 6.8% of scheduled stops in Period 2 of 2026-27, against 3.2% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than West Byfleet on 81.5%. The comparison group includes West Worthing (78.7%), Reigate (81.8%) and Emsworth (76.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 47,795 | 81.5% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at West Byfleet? Delay Repay
These operators call at West Byfleet and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,419 | 82.5% | 3.0% |
| Period 6 of 2026-27 | 3,717 | 86.4% | 2.1% |
| Period 5 of 2026-27 | 3,853 | 84.3% | 4.7% |
| Period 4 of 2026-27 | 3,793 | 84.5% | 2.5% |
| Period 3 of 2026-27 | 3,472 | 81.9% | 3.5% |
| Period 2 of 2026-27 | 3,784 | 79.0% | 6.8% |
| Period 1 of 2026-27 | 4,276 | 85.9% | 2.9% |
| Period 13 of 2025-26 | 3,671 | 86.8% | 1.5% |
| Period 12 of 2025-26 | 3,819 | 81.3% | 3.1% |
| Period 11 of 2025-26 | 3,787 | 83.1% | 1.3% |
| Period 10 of 2025-26 | 3,325 | 77.4% | 2.9% |
| Period 9 of 2025-26 | 3,242 | 69.1% | 2.7% |
| Period 8 of 2025-26 | 3,637 | 74.0% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Worthing | 47,814 | 78.7% | 3.8% |
| Reigate | 47,831 | 81.8% | 5.6% |
| Emsworth | 48,225 | 76.7% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out