West Allerton
WSANorth WestManaged by Northern Trains
How this station is performing
West Allerton had 21,940 scheduled stops to Period 7 of 2026-27, about 60 a day. 75.3% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
West Allerton opened on 2 January 1939, 87 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, West Allerton is the newest; the oldest, Mossley Hill, opened in 1864.
The nearest stations to West Allerton are Mossley Hill (1.2 km north-west), Cressington (1.2 km south), Aigburth (1.4 km west), Liverpool South Parkway (1.7 km south-east) and St Michaels (3.2 km west). 39 stations lie within 10 km in all. At 75.3%, West Allerton is less punctual than all of them; the best of the five, St Michaels, manages 95.6%.
Across the whole run of data, the weakest four-week period for West Allerton was Period 9 of 2023-24, at 63.2%, some time before the latest year. The strongest was Period 13 of 2023-24, at 88.5%, and the two are 25.3 percentage points apart. Cancellations peaked at 11.1% of scheduled stops in Period 10 of 2024-25, against 3.6% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than West Allerton on 75.3%. The comparison group includes Hag Fold (84.1%), Penrith (North Lakes) (51.6%) and Walkden (84.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 21,940 | 75.3% | 3.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,684 | 76.9% | 2.1% |
| Period 6 of 2026-27 | 1,688 | 76.1% | 2.2% |
| Period 5 of 2026-27 | 1,688 | 75.3% | 5.0% |
| Period 4 of 2026-27 | 1,650 | 76.0% | 3.9% |
| Period 3 of 2026-27 | 1,523 | 76.2% | 3.2% |
| Period 2 of 2026-27 | 1,650 | 75.4% | 4.1% |
| Period 1 of 2026-27 | 1,948 | 77.3% | 2.9% |
| Period 13 of 2025-26 | 1,841 | 77.1% | 1.7% |
| Period 12 of 2025-26 | 1,689 | 78.9% | 2.1% |
| Period 11 of 2025-26 | 1,681 | 76.0% | 1.8% |
| Period 10 of 2025-26 | 1,527 | 73.7% | 8.9% |
| Period 9 of 2025-26 | 1,688 | 68.5% | 6.2% |
| Period 8 of 2025-26 | 1,683 | 70.7% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hag Fold | 21,533 | 84.1% | 4.3% |
| Penrith (North Lakes) | 22,409 | 51.6% | 4.6% |
| Walkden | 22,419 | 84.2% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out