Walkden
WKDNorth WestManaged by Northern Trains
How this station is performing
Walkden had 22,419 scheduled stops to Period 7 of 2026-27, about 62 a day. 84.2% of recorded arrivals were within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Walkden opened on 2 July 1888, 138 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Walkden is the newest; the oldest, Kearsley (Manchester), opened in 1838.
The nearest stations to Walkden are Moorside (2.9 km east), Kearsley (Manchester) (3.0 km north-east), Farnworth (3.4 km north), Swinton (Manchester) (3.9 km east) and Moses Gate (4.0 km north). 22 stations lie within 10 km in all. Of the five, Moorside is the most punctual at 87.2% and Moses Gate the least at 52.6%, with Walkden on 84.2%.
Walkden takes its name from a town called Walkden, home to about 35,616 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Walkden was Period 9 of 2023-24, at 73.4%, some time before the latest year. The strongest was Period 1 of 2023-24, at 92.9%, and the two are 19.5 percentage points apart. Cancellations peaked at 9.6% of scheduled stops in Period 6 of 2024-25, against 4.2% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Walkden on 84.2%. The comparison group includes Atherton (83.9%), Daisy Hill (85.7%) and Swinton (Manchester) (82.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 22,419 | 84.2% | 4.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,722 | 81.7% | 2.1% |
| Period 6 of 2026-27 | 1,717 | 86.3% | 1.6% |
| Period 5 of 2026-27 | 1,720 | 88.9% | 4.5% |
| Period 4 of 2026-27 | 1,690 | 83.3% | 5.1% |
| Period 3 of 2026-27 | 1,486 | 85.4% | 4.0% |
| Period 2 of 2026-27 | 1,721 | 80.6% | 5.3% |
| Period 1 of 2026-27 | 2,001 | 87.6% | 2.2% |
| Period 13 of 2025-26 | 1,883 | 89.1% | 4.5% |
| Period 12 of 2025-26 | 1,720 | 86.1% | 2.6% |
| Period 11 of 2025-26 | 1,726 | 84.2% | 6.9% |
| Period 10 of 2025-26 | 1,567 | 83.9% | 5.6% |
| Period 9 of 2025-26 | 1,742 | 76.6% | 5.3% |
| Period 8 of 2025-26 | 1,724 | 80.1% | 5.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Atherton | 22,420 | 83.9% | 4.2% |
| Daisy Hill | 22,420 | 85.7% | 4.2% |
| Swinton (Manchester) | 22,420 | 82.5% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out