GTR at Welwyn Garden City
All trains at Welwyn Garden CityGTR across BritainEast of England
How this operator is doing here
GTR had 64,768 scheduled stops at Welwyn Garden City in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 85.0% of recorded arrivals came within three minutes and 4.8% of stops were cancelled.
GTR trains at Welwyn Garden City also serve Welwyn North (2.7 km north, 72.5% on time, 5.8% cancelled), Hatfield (Herts) (4.1 km south, 86.5% on time, 5.3% cancelled), Welham Green (7.2 km south, 89.3% on time, 4.6% cancelled), Knebworth (7.4 km north, 77.5% on time, 5.7% cancelled), Hertford North (7.7 km east, 88.1% on time, 4.6% cancelled) and Watton-At-Stone (8.5 km north-east, 90.4% on time, 4.9% cancelled), which are the stations on its network closest to Welwyn Garden City.
Within 30 km of here, GTR runs best at Cuffley, 12.1 km south-east (92.1%), and worst at Mill Hill Broadway, 21.2 km south (70.4%).
The busiest GTR station within 30 km of Welwyn Garden City is Finsbury Park, 27.1 km south, with about 426 scheduled stops a day.
Of the 1 operators with enough records at Welwyn Garden City, GTR is the most punctual, at 85.0%.
For GTR, Welwyn Garden City is the 127th best of 307 ranked stations. Its 85.0% here is 2.1 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,170 | 82.4% | 4.3% |
| Period 6 of 2026-27 | 4,916 | 79.5% | 8.6% |
| Period 5 of 2026-27 | 4,977 | 84.5% | 5.6% |
| Period 4 of 2026-27 | 5,116 | 81.1% | 5.8% |
| Period 3 of 2026-27 | 5,079 | 86.9% | 6.3% |
| Period 2 of 2026-27 | 5,020 | 87.3% | 6.6% |
| Period 1 of 2026-27 | 5,864 | 88.7% | 3.3% |
| Period 13 of 2025-26 | 5,480 | 87.9% | 2.4% |
| Period 12 of 2025-26 | 4,330 | 86.6% | 2.3% |
| Period 11 of 2025-26 | 4,646 | 86.0% | 3.8% |
| Period 10 of 2025-26 | 4,176 | 87.6% | 3.3% |
| Period 9 of 2025-26 | 4,833 | 79.5% | 6.2% |
| Period 8 of 2025-26 | 5,161 | 85.8% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Welwyn Garden City
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 1 | – | – |
| Grand Central | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out