Welshpool
WLPWalesManaged by TfW Rail
How this station is performing
Welshpool had 8,580 scheduled stops to Period 7 of 2026-27, about 24 a day. 69.4% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Welshpool opened on 14 August 1860. It was moved to the site it uses now on 18 May 1992. Among the 5 stations nearest to it with a known opening date, Shrewsbury is the oldest (1848) and Caersws the newest (1863), with Welshpool in between.
Welshpool is remote: its nearest neighbours are Newtown (Powys) (19.9 km south-west), Caersws (25.3 km south-west), Church Stretton (26.4 km south-east), Shrewsbury (27.0 km east) and Gobowen (27.1 km north). Of the five, Shrewsbury is the most punctual at 76.7% and Caersws the least at 64.3%, with Welshpool on 69.4%.
Welshpool takes its name from a town of the United Kingdom called Welshpool, home to about 6,664 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Welshpool was Period 8 of 2024-25, at 45.9%, some time before the latest year. The strongest was Period 13 of 2025-26, at 84.7%, and the two are 38.8 percentage points apart. Cancellations peaked at 9.4% of scheduled stops in Period 9 of 2024-25, against 3.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Welshpool is the most punctual, at 69.4%. The comparison group includes Caersws (64.3%), Newtown (Powys) (65.8%) and Llansamlet (60.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 8,580 | 69.4% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Welshpool? Delay Repay
These operators call at Welshpool and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 665 | 68.4% | 3.0% |
| Period 6 of 2026-27 | 678 | 57.1% | 4.1% |
| Period 5 of 2026-27 | 636 | 49.0% | 4.4% |
| Period 4 of 2026-27 | 528 | 57.1% | 6.4% |
| Period 3 of 2026-27 | 621 | 71.3% | 5.2% |
| Period 2 of 2026-27 | 589 | 66.1% | 4.1% |
| Period 1 of 2026-27 | 786 | 77.4% | 1.3% |
| Period 13 of 2025-26 | 753 | 84.7% | 1.2% |
| Period 12 of 2025-26 | 679 | 78.9% | 2.9% |
| Period 11 of 2025-26 | 647 | 81.3% | 4.8% |
| Period 10 of 2025-26 | 632 | 74.0% | 6.3% |
| Period 9 of 2025-26 | 683 | 67.3% | 3.4% |
| Period 8 of 2025-26 | 683 | 62.2% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caersws | 8,579 | 64.3% | 3.6% |
| Newtown (Powys) | 8,579 | 65.8% | 3.6% |
| Llansamlet | 8,714 | 60.0% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out