Watton-At-Stone
WASEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Watton-At-Stone had 25,891 scheduled stops to Period 7 of 2026-27, about 71 a day. 90.4% of recorded arrivals were within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Watton-At-Stone opened on 2 June 1924 and closed to passengers on 11 September 1939. It reopened on 17 May 1982, 44 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Watton-At-Stone is the newest; the oldest, Hertford East, opened in 1843.
The nearest stations to Watton-At-Stone are Knebworth (4.8 km west), Welwyn North (6.1 km south-west), Hertford North (6.7 km south), Hertford East (7.1 km south-east) and Stevenage (7.9 km north-west). 7 stations lie within 10 km in all. Of the five, Hertford East is the most punctual at 92.3% and Welwyn North the least at 72.5%, with Watton-At-Stone on 90.4%.
Watton-At-Stone is named after Watton at Stone, a Village, home to about 2,614 people, but the station stands 0.5 km from its centre.
Watton-At-Stone has slipped a little, from 94.9% within three minutes in the previous 13 periods to 90.4% in the latest 13, a fall of 4.5 percentage points. Cancellations rose to 4.9% of scheduled stops from 3.6%, which is 1.3 percentage points more.
Compared with 3 stations of a similar size in East of England, Watton-At-Stone is the least punctual, at 90.4%. All of them are ahead, including Wivenhoe (93.9%), Hythe (Essex) (93.8%) and Theobalds Grove (90.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,891 | 90.4% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Watton-At-Stone? Delay Repay
These operators call at Watton-At-Stone and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,003 | 89.5% | 4.1% |
| Period 6 of 2026-27 | 1,915 | 65.2% | 9.9% |
| Period 5 of 2026-27 | 1,990 | 81.3% | 7.9% |
| Period 4 of 2026-27 | 2,049 | 93.5% | 7.7% |
| Period 3 of 2026-27 | 2,064 | 92.9% | 7.8% |
| Period 2 of 2026-27 | 2,058 | 91.8% | 5.2% |
| Period 1 of 2026-27 | 2,364 | 94.4% | 4.4% |
| Period 13 of 2025-26 | 2,205 | 94.4% | 2.6% |
| Period 12 of 2025-26 | 1,651 | 92.5% | 3.2% |
| Period 11 of 2025-26 | 1,781 | 94.2% | 1.6% |
| Period 10 of 2025-26 | 1,900 | 94.2% | 2.5% |
| Period 9 of 2025-26 | 1,921 | 93.3% | 4.4% |
| Period 8 of 2025-26 | 1,990 | 94.7% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Wivenhoe | 25,951 | 93.9% | 0.8% |
| Hythe (Essex) | 25,638 | 93.8% | 0.8% |
| Theobalds Grove | 25,614 | 90.6% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out