GTR had 23,228 scheduled stops at Waterbeach in the 13 periods to Period 7 of 2026-27, 91% of the station's total. 68.1% of recorded arrivals came within three minutes and 10.5% of stops were cancelled.
GTR trains at Waterbeach also serve Cambridge North (4.9 km south-west, 68.9% on time, 10.2% cancelled), Cambridge (8.6 km south-west, 68.5% on time, 8.4% cancelled), Ely (15.0 km north, 66.9% on time, 10.7% cancelled), Foxton (18.6 km south-west, 66.8% on time, 5.1% cancelled), Shepreth (19.9 km south-west, 69.8% on time, 5.1% cancelled) and Meldreth (23.0 km south-west, 68.4% on time, 5.1% cancelled), which are the stations on its network closest to Waterbeach.
Within 30 km of here, GTR runs best at Huntingdon, 27.4 km west (79.9%), and worst at Littleport, 23.6 km north (65.2%).
The busiest GTR station within 30 km of Waterbeach is Cambridge, 8.6 km south-west, with about 176 scheduled stops a day.
Of the 2 operators with enough records at Waterbeach, GTR is the least punctual, at 68.1%.
GTR at Waterbeach has slipped sharply. 68.1% of stops came within three minutes of the timetable in the latest 13 periods, 14.3 percentage points worse than the 82.4% recorded in the 13 before. Cancellations rose to 10.5% of scheduled stops from 6.9%, which is 3.6 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,711 | 42.5% | 10.9% |
| Period 6 of 2026-27 | 1,859 | 53.8% | 27.5% |
| Period 5 of 2026-27 | 1,765 | 64.3% | 14.4% |
| Period 4 of 2026-27 | 1,888 | 55.2% | 19.0% |
| Period 3 of 2026-27 | 1,716 | 69.4% | 10.3% |
| Period 2 of 2026-27 | 1,610 | 65.6% | 10.4% |
| Period 1 of 2026-27 | 1,788 | 72.4% | 7.0% |
| Period 13 of 2025-26 | 1,975 | 71.5% | 7.6% |
| Period 12 of 2025-26 | 1,937 | 76.1% | 5.7% |
| Period 11 of 2025-26 | 1,898 | 69.3% | 6.2% |
| Period 10 of 2025-26 | 1,511 | 77.0% | 4.3% |
| Period 9 of 2025-26 | 1,942 | 80.8% | 7.0% |
| Period 8 of 2025-26 | 1,628 | 79.9% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Waterbeach
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 2,226 | 76.9% | 4.4% |
| CrossCountry | 3 | – | – |