Walton (Merseyside)
WAONorth WestManaged by Merseyrail
How this station is performing
Walton (Merseyside) had 42,702 scheduled stops to Period 7 of 2026-27, about 117 a day. 92.1% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Walton (Merseyside) opened on 2 April 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Rice Lane is the oldest (1848) and Orrell Park the newest (1906), with Walton (Merseyside) in between.
The nearest stations to Walton (Merseyside) are Rice Lane (0.2 km north-east), Orrell Park (0.7 km north), Bootle New Strand (1.9 km west), Kirkdale (2.0 km south-west) and Aintree (2.1 km north). 42 stations lie within 10 km in all. Of the five, Orrell Park is the most punctual at 94.6% and Rice Lane the least at 90.7%, with Walton (Merseyside) on 92.1%.
Walton (Merseyside) is named after Walton, an inner city, but the station stands 1.7 km from its centre.
Walton (Merseyside) has edged up: 92.1% of stops came within three minutes of the timetable in the latest 13 periods, 3.2 percentage points better than the 88.9% of the 13 before. Cancellations fell to 1.4% of scheduled stops from 2.2%, which is 0.8 percentage points fewer.
Compared with 3 stations of a similar size in North West, Walton (Merseyside) is the least punctual, at 92.1%. All of them are ahead, including Orrell Park (94.6%), Aughton Park (96.4%) and Maghull North (95.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 42,702 | 92.1% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Walton (Merseyside)? Delay Repay
These operators call at Walton (Merseyside) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,275 | 94.5% | 0.8% |
| Period 6 of 2026-27 | 3,264 | 94.1% | 1.3% |
| Period 5 of 2026-27 | 3,256 | 90.9% | 1.4% |
| Period 4 of 2026-27 | 3,072 | 91.3% | 0.9% |
| Period 3 of 2026-27 | 3,252 | 93.4% | 1.9% |
| Period 2 of 2026-27 | 3,269 | 94.0% | 0.7% |
| Period 1 of 2026-27 | 3,726 | 90.9% | 3.0% |
| Period 13 of 2025-26 | 3,583 | 95.0% | 1.8% |
| Period 12 of 2025-26 | 3,260 | 92.4% | 0.6% |
| Period 11 of 2025-26 | 3,270 | 91.7% | 1.7% |
| Period 10 of 2025-26 | 2,943 | 92.3% | 1.2% |
| Period 9 of 2025-26 | 3,256 | 89.2% | 1.4% |
| Period 8 of 2025-26 | 3,276 | 87.4% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Orrell Park | 42,751 | 94.6% | 1.4% |
| Aughton Park | 42,753 | 96.4% | 1.8% |
| Maghull North | 42,753 | 95.9% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out