Walthamstow Queen's Road
WMWLondonManaged by London Overground
How this station is performing
Walthamstow Queen's Road had 49,803 scheduled stops to Period 7 of 2026-27, about 137 a day. 94.4% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Walthamstow Queen's Road opened on 9 July 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Walthamstow Queen's Road is the newest; the oldest, Walthamstow Central, opened in 1870.
The nearest stations to Walthamstow Queen's Road are Walthamstow Central (0.4 km north-east), St James Street (Walthamstow) (0.6 km west), Blackhorse Road (1.3 km north-west), Wood Street (1.7 km north-east) and Leyton Midland Road (1.8 km south-east). 95 stations lie within 10 km in all. Of the five, Leyton Midland Road is the most punctual at 94.5% and Walthamstow Central the least at 92.0%, with Walthamstow Queen's Road on 94.4%.
Walthamstow Queen's Road is named after Walthamstow, an area of London, home to about 109,424 people, but the station stands 0.3 km from its centre.
2 of 3 stations of a similar size in London are more punctual than Walthamstow Queen's Road on 94.4%. The comparison group includes Blackhorse Road (94.5%), Leyton Midland Road (94.5%) and Leytonstone High Road (94.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,803 | 94.4% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,829 | 95.0% | 2.0% |
| Period 6 of 2026-27 | 3,605 | 94.1% | 4.7% |
| Period 5 of 2026-27 | 3,820 | 93.0% | 4.6% |
| Period 4 of 2026-27 | 3,820 | 94.2% | 4.8% |
| Period 3 of 2026-27 | 3,790 | 93.5% | 2.5% |
| Period 2 of 2026-27 | 3,817 | 93.5% | 6.6% |
| Period 1 of 2026-27 | 4,393 | 96.3% | 0.4% |
| Period 13 of 2025-26 | 4,110 | 95.9% | 0.8% |
| Period 12 of 2025-26 | 3,779 | 95.1% | 1.4% |
| Period 11 of 2025-26 | 3,755 | 95.0% | 2.3% |
| Period 10 of 2025-26 | 3,460 | 94.7% | 3.8% |
| Period 9 of 2025-26 | 3,821 | 92.6% | 1.8% |
| Period 8 of 2025-26 | 3,804 | 94.3% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Blackhorse Road | 49,803 | 94.5% | 3.1% |
| Leyton Midland Road | 49,803 | 94.5% | 3.0% |
| Leytonstone High Road | 49,803 | 94.4% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out