Walsall
WSLWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Walsall had 43,783 scheduled stops to Period 7 of 2026-27, about 120 a day. 91.7% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Walsall opened on 1 November 1847. It was moved to the site it uses now on 9 April 1849. Among the 3 stations nearest to it with a known opening date, Tame Bridge Parkway is the oldest (1837) and Bloxwich the newest (1858), with Walsall in between.
The nearest stations to Walsall are Bescot Stadium (2.4 km south), Darlaston (2.6 km west), Tame Bridge Parkway (3.6 km south), Bloxwich (4.2 km north-west) and Willenhall (4.7 km west). 19 stations lie within 10 km in all. Of the five, Bloxwich is the most punctual at 92.5% and Tame Bridge Parkway the least at 87.7%, with Walsall on 91.7%.
Walsall takes its name from a town of the United Kingdom called Walsall, home to about 67,594 people, and the station stands 0.6 km from its centre.
Compared with 3 stations of a similar size in West Midlands, Walsall is the most punctual, at 91.7%. The comparison group includes Worcester Shrub Hill (72.9%), Rowley Regis (88.1%) and Lichfield Trent Valley (67.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 43,783 | 91.7% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Walsall? Delay Repay
These operators call at Walsall and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,484 | 92.2% | 2.2% |
| Period 6 of 2026-27 | 3,484 | 91.0% | 1.5% |
| Period 5 of 2026-27 | 2,976 | 91.7% | 3.8% |
| Period 4 of 2026-27 | 2,823 | 86.3% | 4.4% |
| Period 3 of 2026-27 | 2,918 | 92.9% | 1.3% |
| Period 2 of 2026-27 | 3,113 | 90.7% | 1.8% |
| Period 1 of 2026-27 | 4,043 | 93.0% | 1.3% |
| Period 13 of 2025-26 | 3,800 | 93.5% | 1.4% |
| Period 12 of 2025-26 | 3,500 | 94.7% | 0.4% |
| Period 11 of 2025-26 | 3,465 | 94.0% | 5.7% |
| Period 10 of 2025-26 | 3,177 | 93.1% | 1.1% |
| Period 9 of 2025-26 | 3,500 | 87.1% | 4.5% |
| Period 8 of 2025-26 | 3,500 | 90.2% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Worcester Shrub Hill | 42,596 | 72.9% | 5.1% |
| Rowley Regis | 42,556 | 88.1% | 3.5% |
| Lichfield Trent Valley | 45,420 | 67.3% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out