Atherton
ATNNorth WestManaged by Northern Trains
How this station is performing
Atherton had 22,420 scheduled stops to Period 7 of 2026-27, about 62 a day. 83.9% of recorded arrivals were within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Atherton opened on 1 July 1888, 138 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Westhoughton is the oldest (1848) and Lostock the newest (1988), with Atherton in between.
The nearest stations to Atherton are Hag Fold (1.2 km north-west), Daisy Hill (2.7 km north-west), Westhoughton (4.2 km north-west), Lostock (5.0 km north) and Walkden (5.5 km east). 17 stations lie within 10 km in all. Of the five, Daisy Hill is the most punctual at 85.7% and Lostock the least at 58.4%, with Atherton on 83.9%.
Atherton takes its name from a town called Atherton, home to about 22,000 people, and the station stands 1.3 km from its centre.
Across the whole run of data, the weakest four-week period for Atherton was Period 9 of 2023-24, at 73.3%, some time before the latest year. The strongest was Period 1 of 2023-24, at 92.4%, and the two are 19.1 percentage points apart. Cancellations peaked at 9.5% of scheduled stops in Period 6 of 2024-25, against 4.2% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Atherton on 83.9%. The comparison group includes Daisy Hill (85.7%), Swinton (Manchester) (82.5%) and Walkden (84.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 22,420 | 83.9% | 4.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,722 | 81.6% | 2.1% |
| Period 6 of 2026-27 | 1,718 | 85.8% | 1.7% |
| Period 5 of 2026-27 | 1,720 | 88.8% | 4.5% |
| Period 4 of 2026-27 | 1,690 | 83.1% | 5.1% |
| Period 3 of 2026-27 | 1,486 | 84.4% | 4.0% |
| Period 2 of 2026-27 | 1,721 | 80.5% | 5.3% |
| Period 1 of 2026-27 | 2,001 | 87.3% | 2.2% |
| Period 13 of 2025-26 | 1,883 | 89.1% | 4.5% |
| Period 12 of 2025-26 | 1,720 | 86.1% | 2.6% |
| Period 11 of 2025-26 | 1,726 | 84.0% | 6.9% |
| Period 10 of 2025-26 | 1,567 | 83.1% | 5.6% |
| Period 9 of 2025-26 | 1,742 | 76.3% | 5.3% |
| Period 8 of 2025-26 | 1,724 | 79.6% | 5.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Daisy Hill | 22,420 | 85.7% | 4.2% |
| Swinton (Manchester) | 22,420 | 82.5% | 4.2% |
| Walkden | 22,419 | 84.2% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out