Upper Holloway
UHLLondonManaged by London Overground
How this station is performing
Upper Holloway had 49,834 scheduled stops to Period 7 of 2026-27, about 137 a day. 94.7% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Upper Holloway opened on 21 July 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Gospel Oak is the oldest (1860) and Drayton Park the newest (1904), with Upper Holloway in between.
The nearest stations to Upper Holloway are Crouch Hill (1.2 km north-east), Finsbury Park (1.6 km east), Kentish Town (1.6 km south-west), Gospel Oak (1.8 km south-west) and Drayton Park (2.0 km south-east). 111 stations lie within 10 km in all. At 94.7%, Upper Holloway is more punctual than every one of them; the best of the five, Crouch Hill, manages 94.6%.
Upper Holloway takes its name from an area of London called Upper Holloway, and the station stands 0.2 km from its centre.
In London, Upper Holloway ranks 16th of 332 ranked stations. Its 94.7% is 5.9 percentage points better than the area median of 88.8%.
Compared with 3 stations of a similar size in London, Upper Holloway is the most punctual, at 94.7%. The comparison group includes Crouch Hill (94.6%), Harringay Green Lanes (94.2%) and South Tottenham (93.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,834 | 94.7% | 3.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,829 | 95.5% | 2.3% |
| Period 6 of 2026-27 | 3,605 | 94.2% | 4.9% |
| Period 5 of 2026-27 | 3,820 | 94.7% | 4.5% |
| Period 4 of 2026-27 | 3,820 | 94.6% | 5.3% |
| Period 3 of 2026-27 | 3,790 | 93.8% | 2.6% |
| Period 2 of 2026-27 | 3,817 | 95.2% | 6.8% |
| Period 1 of 2026-27 | 4,393 | 97.2% | 0.7% |
| Period 13 of 2025-26 | 4,110 | 96.7% | 0.8% |
| Period 12 of 2025-26 | 3,779 | 95.8% | 1.6% |
| Period 11 of 2025-26 | 3,755 | 95.4% | 2.7% |
| Period 10 of 2025-26 | 3,491 | 94.5% | 3.9% |
| Period 9 of 2025-26 | 3,821 | 90.2% | 2.3% |
| Period 8 of 2025-26 | 3,804 | 92.6% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crouch Hill | 49,834 | 94.6% | 3.1% |
| Harringay Green Lanes | 49,834 | 94.2% | 3.1% |
| South Tottenham | 49,834 | 93.9% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out