Tywyn
TYWWalesManaged by TfW Rail
How this station is performing
Tywyn had 5,420 scheduled stops to Period 7 of 2026-27, about 15 a day. 83.2% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Tywyn opened on 24 October 1863, 163 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Tywyn is the oldest; the next oldest, Llwyngwril, dates from 1863.
The nearest stations to Tywyn are Tonfanau (3.8 km north-west), Aberdovey (5.2 km south-east), Penhelig (5.9 km south-east), Llwyngwril (9.0 km north) and Borth (10.9 km south). 4 stations lie within 10 km in all. At 83.2%, Tywyn is more punctual than every one of them; the best of the five, Borth, manages 81.7%.
Tywyn is one of 2 stations named after a town called Tywyn, home to about 3,133 people; this one stands 0.5 km from its centre.
For Tywyn, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 62.4% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2024-25, at 94.7%, which is 32.3 percentage points higher. Cancellations peaked at 9.7% of scheduled stops in Period 9 of 2023-24, against 1.4% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Tywyn is the most punctual, at 83.2%. The comparison group includes Aberdovey (80.3%), Barmouth (81.9%) and Dyffryn Ardudwy (80.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,420 | 83.2% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Tywyn? Delay Repay
These operators call at Tywyn and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 87.9% | 0.9% |
| Period 6 of 2026-27 | 430 | 78.1% | 1.4% |
| Period 5 of 2026-27 | 427 | 62.4% | 2.8% |
| Period 4 of 2026-27 | 426 | 70.9% | 2.3% |
| Period 3 of 2026-27 | 424 | 82.0% | 3.3% |
| Period 2 of 2026-27 | 421 | 79.0% | 0.2% |
| Period 1 of 2026-27 | 487 | 87.7% | 1.2% |
| Period 13 of 2025-26 | 466 | 88.6% | 0.4% |
| Period 12 of 2025-26 | 288 | 93.4% | 0.3% |
| Period 11 of 2025-26 | 392 | 93.0% | 1.3% |
| Period 10 of 2025-26 | 387 | 87.8% | 2.3% |
| Period 9 of 2025-26 | 424 | 89.0% | 1.2% |
| Period 8 of 2025-26 | 424 | 85.0% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Aberdovey | 5,420 | 80.3% | 1.5% |
| Barmouth | 5,389 | 81.9% | 1.3% |
| Dyffryn Ardudwy | 5,356 | 80.4% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out