Aberdovey
AVYWalesManaged by TfW Rail
How this station is performing
Aberdovey has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,420 scheduled stops, about 15 a day. In those periods 80.3% of stops arrived within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Aberdovey opened on 14 August 1867, 159 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tywyn is the oldest (1863) and Penhelig the newest (1933), with Aberdovey in between.
The nearest stations to Aberdovey are Penhelig (1.4 km east), Tywyn (5.2 km north-west), Borth (5.9 km south), Tonfanau (9.0 km north-west) and Dovey Junction (9.2 km east). 5 stations lie within 10 km in all. Of the five, Tywyn is the most punctual at 83.2% and Penhelig the least at 68.4%, with Aberdovey on 80.3%.
Aberdovey is named after Aberdyfi, a Village, home to about 878 people, but the station stands 0.8 km from its centre.
For Aberdovey, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 57.7% of stops arrived within three minutes of the timetable. The strongest was Period 11 of 2025-26, at 91.7%, which is 34.0 percentage points higher. Cancellations peaked at 9.7% of scheduled stops in Period 9 of 2023-24, against 1.5% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Aberdovey is the least punctual, at 80.3%. All of them are ahead, including Tywyn (83.2%), Barmouth (81.9%) and Dyffryn Ardudwy (80.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,420 | 80.3% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Aberdovey? Delay Repay
These operators call at Aberdovey and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 81.8% | 0.9% |
| Period 6 of 2026-27 | 430 | 71.4% | 1.4% |
| Period 5 of 2026-27 | 427 | 57.7% | 2.8% |
| Period 4 of 2026-27 | 426 | – | 2.3% |
| Period 3 of 2026-27 | 424 | 72.2% | 3.3% |
| Period 2 of 2026-27 | 421 | 81.3% | 0.5% |
| Period 1 of 2026-27 | 487 | 80.1% | 1.4% |
| Period 13 of 2025-26 | 466 | 85.8% | 0.6% |
| Period 12 of 2025-26 | 288 | 90.0% | 0.3% |
| Period 11 of 2025-26 | 392 | 91.7% | 1.3% |
| Period 10 of 2025-26 | 387 | 84.9% | 2.3% |
| Period 9 of 2025-26 | 424 | 84.3% | 1.4% |
| Period 8 of 2025-26 | 424 | 79.7% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tywyn | 5,420 | 83.2% | 1.4% |
| Barmouth | 5,389 | 81.9% | 1.3% |
| Dyffryn Ardudwy | 5,356 | 80.4% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out