CrossCountry had 1,445 scheduled stops at Truro in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 56.4% of recorded arrivals came within three minutes and 12.9% of stops were cancelled.
CrossCountry trains at Truro also serve Redruth (12.0 km west, 58.9% on time, 14.1% cancelled), Camborne (17.7 km west, 56.6% on time, 12.9% cancelled), St Austell (21.3 km north-east, 59.5% on time, 12.2% cancelled), Hayle (26.8 km west, 56.5% on time, 12.9% cancelled), Par (27.5 km east, 56.6% on time, 10.7% cancelled) and St Erth (28.9 km west, 54.1% on time, 14.4% cancelled), which are the stations on its network closest to Truro.
The busiest CrossCountry station within 30 km of Truro is Redruth, 12.0 km west, with about 4 scheduled stops a day.
Of the 2 operators with enough records at Truro, CrossCountry is the least punctual, at 56.4%.
CrossCountry at Truro has slipped sharply. 56.4% of stops came within three minutes of the timetable in the latest 13 periods, 13.1 percentage points worse than the 69.5% recorded in the 13 before. Cancellations rose to 12.9% of scheduled stops from 12.2%, which is 0.7 percentage points more.
Over three full railway years CrossCountry at Truro has got worse each time, from 71.8% within three minutes in 2023-24 to 71.7% in 2024-25 and 67.3% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120 | 64.7% | 15.0% |
| Period 6 of 2026-27 | 120 | 47.5% | 15.8% |
| Period 5 of 2026-27 | 117 | 38.6% | 13.7% |
| Period 4 of 2026-27 | 120 | 39.0% | 16.7% |
| Period 3 of 2026-27 | 108 | 51.5% | 6.5% |
| Period 2 of 2026-27 | 112 | 51.5% | 11.6% |
| Period 1 of 2026-27 | 120 | 64.9% | 5.0% |
| Period 13 of 2025-26 | 114 | 74.8% | 6.1% |
| Period 12 of 2025-26 | 104 | 59.0% | 3.8% |
| Period 11 of 2025-26 | 104 | 65.8% | 24.0% |
| Period 10 of 2025-26 | 96 | 57.7% | 26.0% |
| Period 9 of 2025-26 | 94 | 53.8% | 17.0% |
| Period 8 of 2025-26 | 116 | 63.2% | 8.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Truro
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 40,934 | 75.5% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out