West Midlands Railway at Tring
All trains at TringWest Midlands Railway across BritainEast of England
How this operator is doing here
West Midlands Railway had 48,054 scheduled stops at Tring in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 79.9% of recorded arrivals came within three minutes and 6.6% of stops were cancelled.
West Midlands Railway trains at Tring also serve Berkhamsted (5.8 km south-east, 78.8% on time, 7.1% cancelled), Cheddington (7.0 km north-west, 79.4% on time, 5.6% cancelled), Hemel Hempstead (11.1 km south-east, 76.6% on time, 6.9% cancelled), Apsley (13.3 km south-east, 78.6% on time, 6.4% cancelled), Leighton Buzzard (13.4 km north, 75.7% on time, 4.9% cancelled) and Kings Langley (16.4 km south-east, 76.7% on time, 5.9% cancelled), which are the stations on its network closest to Tring.
Within 30 km of here, West Midlands Railway runs best at Park Street, 21.1 km south-east (96.6%), and worst at Milton Keynes Central, 28.0 km north (71.7%).
The busiest West Midlands Railway station within 30 km of Tring is Watford Junction, 21.7 km south-east, with about 202 scheduled stops a day.
Of the 1 operators with enough records at Tring, West Midlands Railway is the most punctual, at 79.9%.
For West Midlands Railway, Tring is the 104th best of 169 ranked stations. Its 79.9% here is 1.2 percentage points below the 81.1% across the whole network.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,729 | 80.6% | 4.7% |
| Period 6 of 2026-27 | 3,841 | 78.0% | 8.8% |
| Period 5 of 2026-27 | 3,839 | 78.4% | 8.5% |
| Period 4 of 2026-27 | 3,529 | 78.4% | 5.4% |
| Period 3 of 2026-27 | 3,743 | 81.6% | 4.5% |
| Period 2 of 2026-27 | 3,369 | 77.7% | 12.9% |
| Period 1 of 2026-27 | 3,571 | 80.5% | 6.7% |
| Period 13 of 2025-26 | 4,207 | 85.2% | 3.4% |
| Period 12 of 2025-26 | 3,841 | 82.0% | 7.2% |
| Period 11 of 2025-26 | 3,841 | 80.1% | 7.2% |
| Period 10 of 2025-26 | 3,031 | 80.0% | 6.6% |
| Period 9 of 2025-26 | 3,751 | 77.9% | 5.7% |
| Period 8 of 2025-26 | 3,762 | 76.6% | 5.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Tring
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 2 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out