CrossCountry at Totnes
How this operator is doing here
CrossCountry had 10,007 scheduled stops at Totnes in the 13 periods to Period 7 of 2026-27, 34% of the station's total. 69.0% of recorded arrivals came within three minutes and 7.5% of stops were cancelled.
CrossCountry trains at Totnes also serve Paignton (8.8 km east, 74.1% on time, 21.8% cancelled), Torquay (10.7 km east, 70.0% on time, 21.8% cancelled), Newton Abbot (12.3 km north-east, 66.8% on time, 8.9% cancelled), Teignmouth (18.5 km north-east, 55.4% on time, 17.2% cancelled), Dawlish (22.6 km north-east, 52.2% on time, 17.3% cancelled) and Dawlish Warren (25.1 km north-east, – on time, – cancelled), which are the stations on its network closest to Totnes.
The busiest CrossCountry station within 30 km of Totnes is Newton Abbot, 12.3 km north-east, with about 33 scheduled stops a day.
Of the 2 operators with enough records at Totnes, CrossCountry is the most punctual, at 69.0%.
For CrossCountry, Totnes is the 26th best of 99 ranked stations. Its 69.0% here is 5.8 percentage points above the 63.2% across the whole network.
CrossCountry at Totnes has slipped sharply. 69.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.3 percentage points worse than the 74.3% recorded in the 13 before. Cancellations rose to 7.5% of scheduled stops from 5.6%, which is 1.9 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 783 | 72.2% | 7.3% |
| Period 6 of 2026-27 | 800 | 65.5% | 11.5% |
| Period 5 of 2026-27 | 810 | 61.6% | 6.4% |
| Period 4 of 2026-27 | 800 | 65.4% | 6.5% |
| Period 3 of 2026-27 | 789 | 66.5% | 4.6% |
| Period 2 of 2026-27 | 798 | 66.3% | 4.0% |
| Period 1 of 2026-27 | 910 | 73.4% | 3.4% |
| Period 13 of 2025-26 | 655 | 74.0% | 5.3% |
| Period 12 of 2025-26 | 572 | 80.5% | 5.9% |
| Period 11 of 2025-26 | 798 | 76.7% | 15.0% |
| Period 10 of 2025-26 | 735 | 70.4% | 14.8% |
| Period 9 of 2025-26 | 800 | 61.1% | 8.5% |
| Period 8 of 2025-26 | 757 | 67.7% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Totnes
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 19,235 | 61.5% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out