How this station is performing
Tondu had 11,503 scheduled stops to Period 7 of 2026-27, about 32 a day. 71.3% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Tondu opened on 25 February 1864. It was moved to the site it uses now on 28 September 1992. Among the 5 stations nearest to it with a known opening date, Bridgend is the oldest (1850) and Garth (Bridgend County) the newest (1992), with Tondu in between.
The nearest stations to Tondu are Sarn (1.1 km south), Wildmill (3.2 km south), Bridgend (4.7 km south), Garth (Bridgend County) (6.4 km north-west) and Pencoed (7.0 km east). 8 stations lie within 10 km in all. Of the five, Wildmill is the most punctual at 74.2% and Bridgend the least at 70.4%, with Tondu on 71.3%.
Tondu takes its name from a Village called Tondu, and the station stands 0.2 km from its centre.
Tondu improved sharply over the past year. In the latest 13 periods 71.3% of stops came within three minutes of the timetable, up 7.2 percentage points from 64.1% in the 13 before. Cancellations fell to 2.2% of scheduled stops from 3.0%, which is 0.8 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Tondu is the least punctual, at 71.3%. All of them are ahead, including Garth (Bridgend County) (72.6%), Maesteg (Ewenny Road) (73.3%) and Sarn (71.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 11,503 | 71.3% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Tondu? Delay Repay
These operators call at Tondu and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 885 | 70.7% | 1.6% |
| Period 6 of 2026-27 | 891 | 73.7% | 1.3% |
| Period 5 of 2026-27 | 783 | 67.4% | 4.5% |
| Period 4 of 2026-27 | 905 | 71.0% | 1.8% |
| Period 3 of 2026-27 | 799 | 72.3% | 2.5% |
| Period 2 of 2026-27 | 899 | 74.2% | 2.6% |
| Period 1 of 2026-27 | 1,040 | 75.9% | 1.8% |
| Period 13 of 2025-26 | 969 | 78.8% | 1.3% |
| Period 12 of 2025-26 | 886 | 78.2% | 3.5% |
| Period 11 of 2025-26 | 861 | 79.2% | 1.2% |
| Period 10 of 2025-26 | 817 | 69.1% | 2.1% |
| Period 9 of 2025-26 | 884 | 52.0% | 2.4% |
| Period 8 of 2025-26 | 884 | 62.6% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Garth (Bridgend County) | 11,503 | 72.6% | 3.0% |
| Maesteg (Ewenny Road) | 11,503 | 73.3% | 3.0% |
| Sarn | 11,503 | 71.5% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out