Sarn
SRRWalesManaged by TfW Rail
How this station is performing
Sarn has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 11,503 scheduled stops, about 32 a day. In those periods 71.5% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Sarn opened on 28 September 1992, 34 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sarn is the newest; the oldest, Bridgend, opened in 1850.
The nearest stations to Sarn are Tondu (1.1 km north), Wildmill (2.2 km south), Bridgend (3.6 km south), Pencoed (6.3 km east) and Garth (Bridgend County) (7.4 km north-west). 8 stations lie within 10 km in all. Of the five, Wildmill is the most punctual at 74.2% and Bridgend the least at 70.4%, with Sarn on 71.5%.
Sarn is one of 3 stations named after a Village called Sarn, home to about 2,443 people; this one stands 0.4 km from its centre.
2 of 3 stations of a similar size in Wales are more punctual than Sarn on 71.5%. The comparison group includes Garth (Bridgend County) (72.6%), Maesteg (Ewenny Road) (73.3%) and Tondu (71.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 11,503 | 71.5% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Sarn? Delay Repay
These operators call at Sarn and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 885 | 69.0% | 1.5% |
| Period 6 of 2026-27 | 891 | 72.1% | 1.1% |
| Period 5 of 2026-27 | 783 | 67.7% | 4.6% |
| Period 4 of 2026-27 | 905 | – | 1.5% |
| Period 3 of 2026-27 | 799 | 72.6% | 1.6% |
| Period 2 of 2026-27 | 899 | 75.2% | 2.3% |
| Period 1 of 2026-27 | 1,040 | 79.3% | 1.1% |
| Period 13 of 2025-26 | 969 | 79.4% | 0.7% |
| Period 12 of 2025-26 | 886 | 79.6% | 2.4% |
| Period 11 of 2025-26 | 861 | 78.1% | 0.6% |
| Period 10 of 2025-26 | 817 | 68.0% | 1.5% |
| Period 9 of 2025-26 | 884 | 52.9% | 1.4% |
| Period 8 of 2025-26 | 884 | 60.3% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Garth (Bridgend County) | 11,503 | 72.6% | 3.0% |
| Maesteg (Ewenny Road) | 11,503 | 73.3% | 3.0% |
| Tondu | 11,503 | 71.3% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out