CrossCountry at Tiverton Parkway
All trains at Tiverton ParkwayCrossCountry across BritainSouth West
How this operator is doing here
CrossCountry had 12,615 scheduled stops at Tiverton Parkway in the 13 periods to Period 7 of 2026-27, 39% of the station's total. 57.1% of recorded arrivals came within three minutes and 7.1% of stops were cancelled.
CrossCountry trains at Tiverton Parkway also serve Taunton (21.5 km north-east, 60.0% on time, 7.0% cancelled), Exeter St David's (24.6 km south-west, 66.9% on time, 7.3% cancelled), Dawlish Warren (35.9 km south, – on time, – cancelled), Dawlish (38.2 km south, 52.2% on time, 17.3% cancelled), Teignmouth (42.2 km south, 55.4% on time, 17.2% cancelled) and Newton Abbot (46.2 km south, 66.8% on time, 8.9% cancelled), which are the stations on its network closest to Tiverton Parkway.
The busiest CrossCountry station within 30 km of Tiverton Parkway is Exeter St David's, 24.6 km south-west, with about 35 scheduled stops a day.
Of the 2 operators with enough records at Tiverton Parkway, CrossCountry is the least punctual, at 57.1%.
CrossCountry at Tiverton Parkway has slipped sharply. 57.1% of stops came within three minutes of the timetable in the latest 13 periods, 8.8 percentage points worse than the 65.9% recorded in the 13 before. Cancellations rose to 7.1% of scheduled stops from 5.0%, which is 2.1 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 936 | 57.3% | 9.2% |
| Period 6 of 2026-27 | 980 | 44.1% | 9.7% |
| Period 5 of 2026-27 | 977 | 42.9% | 7.7% |
| Period 4 of 2026-27 | 970 | 53.4% | 5.8% |
| Period 3 of 2026-27 | 950 | 54.2% | 3.9% |
| Period 2 of 2026-27 | 974 | 55.5% | 4.9% |
| Period 1 of 2026-27 | 1,096 | 64.8% | 2.8% |
| Period 13 of 2025-26 | 1,033 | 69.4% | 2.6% |
| Period 12 of 2025-26 | 942 | 76.2% | 4.9% |
| Period 11 of 2025-26 | 969 | 67.2% | 11.0% |
| Period 10 of 2025-26 | 881 | 52.9% | 15.2% |
| Period 9 of 2025-26 | 980 | 48.0% | 10.7% |
| Period 8 of 2025-26 | 927 | 53.0% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Tiverton Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 19,616 | 57.1% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out