Three Oaks
TOKSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Three Oaks has usable figures for 4 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,536 scheduled stops, about 34 a day. In those periods 79.0% of stops arrived within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Three Oaks opened on 1 July 1907, 119 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Three Oaks is the newest; the oldest, Hastings, opened in 1851.
The nearest stations to Three Oaks are Doleham (2.0 km north), Ore (4.1 km south), Hastings (5.4 km south-west), St Leonards Warrior Square (6.2 km south-west) and Winchelsea (7.3 km north-east). 8 stations lie within 10 km in all. Of the five, Winchelsea is the most punctual at 88.5% and Hastings the least at 77.5%, with Three Oaks on 79.0%.
Three Oaks takes its name from a settlement called Three Oaks, and the station stands 0.1 km from its centre.
For Three Oaks, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 60.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2025-26, at 93.7%, which is 32.8 percentage points higher. Cancellations peaked at 10.1% of scheduled stops in Period 8 of 2023-24, against 3.8% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,536 | 79.0% | 3.8% |
Operators with their own page for this station are linked to it.
Late train at Three Oaks? Delay Repay
These operators call at Three Oaks and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 976 | 76.1% | 5.7% |
| Period 6 of 2026-27 | 979 | 60.9% | 5.1% |
| Period 5 of 2026-27 | 940 | – | 4.6% |
| Period 4 of 2026-27 | 946 | – | 2.6% |
| Period 3 of 2026-27 | 985 | – | 5.4% |
| Period 2 of 2026-27 | 918 | – | 5.4% |
| Period 1 of 2026-27 | 1,128 | – | 1.4% |
| Period 13 of 2025-26 | 985 | – | 4.6% |
| Period 12 of 2025-26 | 919 | 91.2% | 1.8% |
| Period 11 of 2025-26 | 985 | – | 2.8% |
| Period 10 of 2025-26 | 892 | – | 4.3% |
| Period 9 of 2025-26 | 990 | 87.7% | 3.6% |
| Period 8 of 2025-26 | 893 | – | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out